. Stage 2 (Weeks2,3 and 4) -
Construction of the tower;
.
’
Stage 3 (Weeks5 and 6) -
Construction of the outdoor cabinet~ and fences;
Stage 4 (W eks 7 -
10)- Installation of antennas and radio equipment, as well as
equipment testing.
Once operational, the facility will function on a continuously unstaffed basis and will
typically only require maintenance works once a year, for approximately one day per year.
5.1.5 Utility Service Details
Power for the proposed facility will be sourced from an existing network on Coles Creek
Road’ approximately 700m away. The conditions of supply are subject to, further
investigation. Please refer to Drawing C2 of the Proposal Plans attached as Appendix 3
’
for further details.
5.1.6 Construction and Noise
Noise and vibration, emissions associated with the proposed facility will be limited to the
construction phase outlined above. Noise generated during the construction phase will be
of short duration and will be in accordance with the standards outlined in the
Environmental Protection Regulation 1998 and Environmental Protection (Noise) Policy
1997. Construction works will only occur between the hours of 7.00am and 6.00pm.
There will be some low level noise from ~he ongoing operation of air condition’ing
equipment associated with the equipment shelter, once installed. Noise emanating from
the air conditioning equipment is at a comparable level to a domestic air conditioning
installation, and will generally accord with the background noise levels prescribed by
Australian Standard AS1055.
5.2 Site Selection
..
The reasons for selecting this site are as follows:
.
...
,
. The site ,is appropriately located within a low density rural: area which is
characterised by agricultural grazing properties, heavily vegetated hinterland and
valley areas and large rural-residential allptments;
. The proposed location provides an adequate separation distance from community
sensitive land uses and is setback more than 275m from the closest residential
dwelling and within proximity to two. residential dwellings within a 500m radius;
. The proposed facility’ is located a suffici nt buffer distance from environmentally
sensitive locations and no v’egetation removal will be required;
. The location is well removed from significant transport routes (over 700m from
Coles Creek Road and Schreibers Road) and provides line of sight to. other
planned sites in the NBN wireless network; and
. The siting of a Telecommunication Facility on this site will meet coverage
objectives for the area, whilst minimising visual impact given the natural vegetation
screening and backdrop of the ridgeline located south of the site. These factors will
assist with visually integrating the monopole within its surroundings and reducing
the visual dominance of the structure.
NBN-4TNZ-41NN-5104 - Cooran Page 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 Planning Report MCU13/0051Related documentApplication case desk ↗
About this file
- File size
- 109 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.