Skip to the record
Accept no imitations.

Council archive · source document

Development Application part 2 Planning Report MCU13/0051

of 122

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (109 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

e)ensure filling or excavation      flood modelling is
does not adversely impact           available-a minimum
upon other premises by-             of 500mm above the
  i. causing ponding of             modelled flood level;
         water on the site or       and
         nearby land;               c)for areas where
  ii.    increasing flooding,       flood modelling is not
         which adversely affects    available, a minimum
         the safety or use of any   of 500mm above the
         land upstream and          highest known flood
         downstream; and            level;
  iii.   adversely affecting the
         flow of water in any       AND
         overland flow path.        512.2 Where Council
                                    infrastructure is
                                    available-
                                    a) any drainage (from
                                    buildings and land)
                                    flows to that
                                    infrastructure; and
                                    b) the infrastructure
                                    has the capacity to
                                    accept any additional
                                    loading;

                                    AND
                                    512.3 Car parking and
                                    manoeuvring areas are
                                    constructed at a level
                                    that permits the
                                    parking area to drain
                                    from the site by gravity
                                    means, without the
                                    need for mechanical
                                    pumping; or

                                    512.4 Basements for
                                    residential uses have
                                    flood immunity above
                                    the 0100 where,
                                    alternative means to
                                    mechanical pumping
                                    are used to achieve

                                    such immunity; or


                                    512.5 Basements for
                                    non-residential uses
                                    have flood immunity
                                    above the 0100 that
                                    may be achieved by
                                    means of mechanical

                                    pumping where the
                                    mechanical’feature is
                                    installed with adequate
                                    holding tanks and an
                                    alternative back up
                                    power source.

Used in these records

About this file

File size
109 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 2 Planning Report MCU13_0051.pdf · 109 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.