Appendix A - Bushfire Hazard Assessment & Management Plan

Attached to the e-mail RAL20/0014 - Response to Council's Information Request - 9A Jirrima Cres, Cooroibah - Email 01 of 02.

of 35

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (14.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Bushfire Hazard Assessment & Management Plan v1                                 NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah



6     AUSTRALIAN STANDARD 3959:2018 CONSTRUCTION OF BUILDINGS IN
      BUSHFIRE PRONE AREAS (AS 3959:2018) SETBACKS

The site is mapped within the Natural Hazards Overlay in the Noosa Plan 2020 (refer to Plate
13)




                                                                                                    DRAFT NOT FOR SUBMISSION PURPOSES
                                Plate 13 – Noosa Natural Hazards Overlay map

Building works within Designated Bushfire Prone Areas identified on a Bushfire Hazard
Overlay Map prepared under a power of legislation triggers building design assessment under
AS 3959:2018. The Standard provides minimum construction requirements for new habitable
dwellings and habitable building alterations in designated Bushfire Prone Areas. The
construction requirements are intended to improve the performance of buildings subjected to
burning debris, radiant heat or flame contact. Building works in Designated Bushfire Prone
Areas must be built to the Bushfire Attack Level (BAL) construction standard relevant to the
building site as identified by the AS 3959:2018 methodology.
A specific BAL assessment will be required once building plans have been progressed given
the BAL relies on an accurate understanding of the final footprint of the building within the BLE
and is required to be assessed against the active iteration of the Standard at the time of
assessment.
Based on the Plan of Development and the proposed setbacks to hazardous vegetation of
14m, it is anticipated that the future dwelling on Lot 1 will be exposed to a maximum BAL 29
Construction Standard.
LEGISLATION AND OVERLAYS
6.1      Noosa Plan 2020 – Natural Hazards Overlay Code
The proposed development is considered assessable development and therefore is
assessable against Table 13.9 Bushfire Hazard Area of Council’s Natural Hazards Overlay
Code which has been reproduced as Table 5.




© 2020                                                  25
Log in to download the original file

Appendix A - Bushfire Hazard Assessment & Management Plan.pdf · 14.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.