Original source · versioned page text
Appendix A - Bushfire Hazard Assessment & Management Plan
Attached to the e-mail RAL20/0014 - Response to Council's Information Request - 9A Jirrima Cres, Cooroibah - Email 01 of 02.
The original of this document is very large (14.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnBushfire Hazard Assessment & Management Plan v1 NCES REF: J000706 Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah Table 5 – Table 8.2.3.3 Bushfire Hazard Area Code –Noosa Plan 2020 PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSED SOLUTION Safety of people and property PO1 AO1.1 A01.1 This Bushfire Hazard Assessment and Management Plan has been Development maintains the safety of people and Development which will materially increase the number of people living prepared to maintain the safety of people and property from the adverse impacts property from the adverse impacts of bushfire. or congregating on premises, including reconfiguring a Lot, is not located of bushfire. Post development, the proposed Lot 1 BLE will be located within a within a medium or high bushfire hazard area. Potential Impact Buffer . DRAFT NOT FOR SUBMISSION PURPOSES AO1.2 A01.2 The proposed Lot 1 BLE has been setback a minimum of 14m from all Development maximises setbacks from hazardous vegetation to achieve hazardous vegetation areas. With the implementation of the recommendations of an acceptable risk. this report it is anticipated that the risk to the Lot 1 building envelope will be reduced to no greater than a tolerable risk thereby satisfying the SPP State Interest Editor’s Note — PSP8 Natural Hazards provides guidance for assessing Policy No 2. bushfire hazard risk and preparing a bushfire hazard management plan. Impacts on Ecologically Important Areas PO2 PO2 Bushfire mitigation measures do not adversely impact No acceptable outcome provided 1. Bushfire mitigation measures are not expected to affect the biodiversity values on: currently existing within the site. A small amount of regrowth vegetation will be required for removal to develop the BLE and APZ requirements. This is not 1. biodiversity values, connectivity and expected to affect the long term physical integrity and function of the local ecosystem functioning; and regional ecosystem. 2. the long term physical integrity of 2. Bushfire mitigation measures are not expected to affect the long term physical waterways, wetland and areas of integrity of waterways, wetlands and areas of native vegetation. native vegetation. Water Supply for Fire Fighting Purposes PO3 AO3.1 A03.2 – The site will not be connected to a reticulated water supply. Water Development provides an adequate water supply for fire Premises are connected to the reticulated water supply. supply recommendations have been set herein consistent with SPP Assessment fighting purpose which is reliable, safely located and Benchmark water supply requirements. freely accessible. Editor's note—For reconfiguring a Lot, water supply needs to provide for a minimum flow and pressure of 10 litres a second at 200kPa at all times for fire fighting purposes. OR AO3.2 Where there is no available reticulated water supply, the premises has: 1. an accessible dam, swimming pool or water tank available for fire fighting purposes with an onsite water volume of not less than 5,000 litres; and 2. a water supply outlet pipe 50 millimetres in diameter fitted with a standard fire brigade fitting connected to the water supply (other than where the water supply is in a swimming pool or dam). Editor’s Note—Water supply capacity for fire fighting purposes is in addition to water supply capacity for other uses and activities on the premises. © 2020 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.