Original source · versioned page text
Appendix A - Bushfire Hazard Assessment & Management Plan
Attached to the e-mail RAL20/0014 - Response to Council's Information Request - 9A Jirrima Cres, Cooroibah - Email 01 of 02.
The original of this document is very large (14.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnBushfire Hazard Assessment & Management Plan v1 NCES REF: J000706 Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSED SOLUTION Essential Community Infrastructure PO4 AO4.1 PO4 - The proposed development does not involve essential community Essential community infrastructure is able to function Development involving essential community infrastructure is not located infrastructure. effectively during and immediately after bushfire events. within a medium or high bushfire hazard area. OR DRAFT NOT FOR SUBMISSION PURPOSES AO4.2 Where located in a medium or high bushfire hazard area, development involving essential community infrastructure is designed to function effectively during and after a bushfire event in accordance with a Bushfire Hazard Management Plan. Editor’s Note— PSP8 Natural Hazards provides guidance for assessing bushfire hazard risk and preparing a bushfire hazard management plan. Hazardous Materials PO5 AO5 PO5 - The proposed development does not involve the manufacture or storage Public safety and the environment are not adversely Hazardous materials are not manufactured or stored in bulk in a bushfire of hazardous materials in bulk. affected by the impacts of bushfire on hazardous hazard area. materials manufacturing or storing in bulk. Access and Evacuation Routes PO6 AO6.1 PO6 - N/A – No new roads are proposed. Roads provide for easy and safe evacuation of residents The road layout provides for through-roads and avoids cul-de-sacs and of premises and access by emergency services. dead-end roads. OR AO6.2 The development has a perimeter road reserve with a minimum width of 20 metres and maximum gradient of 12.5%. OR AO6.3 Cul-de-sacs or no-through roads are provided with fire trails or access easements, which are capable of being navigated by conventional vehicles and which link to through roads. AO6.4 Safe access and egress is available at all times to all of the development for emergency vehicles and personnel. AO6.5 Where an emergency access point is required, it complies with the relevant works codes and PSP6 Engineering Design Standards. Lot design PO7 AO7 A07 Lot design and building siting minimises bushfire hazard Each residential Lot: risk to people and property. © 2020 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.