2009/1058

 

  
  
 
    
   
 

 
 
   

 

: 31 August 2009
31 August 2009
“31 August 2009
; North East elevation - Sparks Architect 737 August 2009
South East Elevation — Sparks Architect. 31 August 2009
South West Elevation — Sparks Architect 31 August 2009
Section A - Sparks Architect “31 August 2006

‘Section B — Sparks Architect “37 August 2009 ©
: : ! Section Sparks ‘eohitect A 31 Agus 3008”
and as may be amended by these conditions and annotations on the plans. oo

First Floor Plan — Sparks Architect
Roof Plan ~ Sparks Architect ~
North West Elevation — Sparks Architect

  

Relevant Period

2.

The Development Permit for a material change of use lapses if the use has not happened by
1 October 2013, unless an application to extend the currency is approved by Council.

Building Height

3. The building height shall not exceed 8.0 metres above the natural ground level, the finished
ground level and 2 storey.

4. A verification survey of the building is to be carried. out by a Licensed Surveyor and a
certificate lodged with Council at completion of the work confirming compliance with the
maximum: allowable building height as required by either the conditions of approval or the
Planning Séheme. >

Security Bond /

5. Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be

submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for building works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.

Landscaping and Vegetation

6.

All Pandanus tectorius trees on site shall be retained, or, alternatively relocated to a suitable
location on site. In this regard all Pandanus tectorius trees on site shall be surveyed and
indicated on the a site plan and submitted to Council's Planning Assessment Section -
Tewantin Office prior to the issue of a development permit for building works.

Existing trees on the site and within road reserves are to be retained, except where required |
to be removed due to building operations or the conduct of the approved use. fn this regard
the removal of vegetation shall not extend beyond metres 3 metres of the building footprint
of the detached house, with the exception of the Pandanus tectorius trees pursuant to
Candition 6. . :

A minimum of 20% of the site shail be retained as soft landscaping.

All other vegetation shall be protected from interference resulting from clearing or
construction activities by:

9.1. Clearly marking vegetation to be retained with flagging tape;
9.2. Installing protective fencing around the drip line of the vegetation;

9.3. Stockpiling, storage and vehicle parking occurs in already cleared areas and does
not cause interference with vegetation; and

Page 2 of tf

Used in these records

About this file

File size
2.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1058 - Change a Development Approval [As Published].pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.