Council archive · source document
09/1058 - Change a Development Approval [As Published] · 132009.1058.02
2009/1058 Sewer Mains 37. 33. The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in accordance with Council's standards and requirements at no cost to Council. The applicant is advised that this approval does not relate to sewer main setbacks within the site or adjacent to the site, as a Building Certifier will assess this during the Building Application process and after consultation with Council's Water & Sewerage section. Should any Council sewer mains be affected as a result of non-compliance with this condition, the Building Certifier will be held personally liable. To this end, all Building Applications will need a site plan prepared & certified by a licensed surveyor clearly illustrating the exact location of any séwer mains and the ‘zone of influence’ of these mains. Town Water Supply 39. 40. The site shall be connected to Council's existing town water supply and be constructed in accordance with Council’s standards and requirements at no cost to Council. Each individual water connection to the water reticulation system shail extend to the property boundary and be metered. All fees for the’ supply of water meters shall be paid to the Council. Earthworks 41. 42. Earthworks carried out on site shall not affect the structural integrity of any of the existing fences or structures that border the development site. Fences that are affected shall be replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard any fences to be replaced shall be clearly shown on the plans submitted for Building Works approval. Earthworks required on site shall be carried out in accordance with Council's Planning Scheme Policy PSP5 Engineering Design Standards, so as not to cause the additional ponding of water on any adjoining lands or concentrate or direct overland flow on to an adjoining property. Site Stability 43. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site, determine the soil classification, establish whether any measures are required to protect the stability of adjoining buildings and/or structures and/or land, and make recommendations on the type of foundation system(s) best suited for the proposed development and recommend any measures to prevent slumping during excavations. The recommendations of this report shall be incorporated into the design and construction of the proposed development. Erosion and Sediment Control 44, Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site control measures such as silt fencing, controled gravel access to the site and controlled disposal of waste, will be necessary. in this regard, plans detailing the methods of controlling erosion and sediment in accordance with the Healthy Waterways document and fact sheet series titled Controlling Stormwater Pollution on your Building Site dated 2006 are required to be submitted with the application for a Building Works Permit. General Engineering 45. 46. Any damage caused to any public utility during the course of construction shail be repaired to Council’s standards and at no cost to Council. Any alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site shall be at no cost to Council Page 6 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1058 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.