09/1058 - Change a Development Approval [As Published] · 132009.1058.02
2009/1058
“Melais — please specify 7
Asbestos
ner — please specify ©
NOTE: Details of site area to be used for onsite separation, treatment and storage
(including weather protection) shall be provided on the plan drawings accompanying your
application.
i The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
| effective reuse and recycling of such materials. Additionally, Council rewards those who
| segregate waste by significantly reducing disposal fees at the landfill with some items free.
: Higher gate fees are charged for loads of mixed waste.
Vehicle Access
30. A vehicular access driveway to serve the house shall be constructed from the Piper Street
frontage of the site with a maximum width of 4.5m pursuant to the Detached House
Driveways Code.
31. To ensure pedestrian safety between vehicles exiting the site and pedestrians on the
footpath, the driveway and any associated fencing or vegetation near the driveway shall
comply with the minimum sight line requirements as defined in AS 2890.1, section 3.2.4.
. The applicant shall demonstrate compliance by illustrating these sight lines on the plans
submitted for Building Works approval.
32. A Road/Footpath Permit shall be completed and submitted for the construction of the access
driveway in accordance with Council's Local Law No.8. If approval is given the driveway
Shall be constructed in accordance with Council's standard drawings, which will be provided
at time of approval.
" Roof Water & Stormwater Drainage
33. Roof runoff from any new building shall be directed to a rainwater storage system or tank
with a minimum capacity of 3000 litres that is installed to ensure water from the rainwater
storage system or tank is used for external purposes (such as watering gardens, irrigation,
ornamental ponds, water features, topping-up swimming pools, outdoor cleaning, etc) and
for internal (ground floor) use in washing machine cold taps and toilet cisterns.
34. All rainwater tanks are to be designed and installed in accordance with the Queensland
Development Code (QDC) current at the time of building approval, and shall be part of the
plumbing application for approval. The location and capacity of the tanks shall be clearly
shown on the plans submitted for Building Works approval and any overflow shall be
directed to the Piper Street road frontage.
35. All stormwater drainage (including roof water overflow from the rainwater storage system)
shall be collected and discharged so there is no net increase in stormwater runoff from the
site. Stormwater drainage permitted to drain from the site shall be discharged to Council's
kerb & channel drainage system in Piper Street or discharged via on-site infiltration pits.
Plans of the drainage design must be prepared and certified by a Registered Professional
Civil Engineer and submitted for Building Works Approval.
1. The maximum discharge of stormwater drainage allowable to Council's kerb &
channel street drainage system at any one location is 25 litres/second.
2. The stormwater drainage design must ensure that no ponding or scour occurs on ;
the subject site or on neighbouring properties.
36. All site stormwater drainage shall be by means of a gravity system.
Page Sof 71
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1058 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.