Council archive · source document
Decision Notice OPW14-0121 388 David Low Way Peregian Beach · OPW14/0121
OPW14/0121
2. Prior to arranging a prestart meeting and the commencement of the construction of
the proposed driveway and associated works, a Construction Management Plan
must be submitted and approved by Council, the plan must address in particular:
(a) Traffic Management during all aspects of the construction phase including:
(i) Temporary signage and traffic control measures in accordance with
Manual of Uniform Traffic Control Devices (MUTCD) to provide warning
to drivers and road users of any safety hazard or changes to traffic
conditions due to the proposed works.
(ii) Fencing to the work site during the construction phase as may be
necessary to ensure the safety of the public and the road users.
(iii) Maintenance of safe pedestrian and cyclists access across the
frontages of the site at all times both during daily construction and after
daily construction has ceased.
(iv) Providing parking arrangements within the site for the workers and any
machinery. The parking arrangements must not adversely impact on
the traffic flows and/or traffic safety in David Low Way.
(v) Maintaining vehicular access to the site at all times or providing an
agreed alternative arrangement for the users of the site during the
construction stage.
(b) Effective procedures and measures to minimise adverse environmental
impact on other properties and roads users including noise and dust
emission.
(c) Establishment of a communication protocol with all user of the site and any
other affected parties to advise of construction times, impacts on traffic,
access to the site and any other relevant issues.
3. At least 5 working days prior to any works commencing, written advice must be
provided to Council detailing:
(a) The name, contact details and CAN/ABN for the Principal Contractor and
supervising registered engineer (RPEQ).
(b) Proposed dates for commencement and completion of construction.
(c) Certificates demonstrating currency of public liability insurance and works
insurance covering the works in line with the planning scheme and any
applicable government legislations.
Any changes to the details associated with the supervising RPEQ or Principal
Contractor during construction, must be notified to Council in writing within 5
business days of the change occurring.
4. Any conflict between the development and an existing or proposed service must be
referred to the relevant service authority for determination prior to commencement
of works.
General
5. The developer must meet any costs to repair damage to any Council asset during
construction, where damage is a result of the development works. Damage to
assets must be repaired immediately where it creates a hazard to the community.
In circumstances where the damage does not create a hazard to the community, it
must be repaired immediately on completion of the works associated with the
development. A condition report including photographs of the frontage of the site
Page 2 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice OPW14-0121 388 David Low Way Peregian BeachRelated documentApplication case desk ↗
About this file
- File size
- 70 KB (small file)
- File type
No other editions are linked here.