Decision Notice OPW14-0121 388 David Low Way Peregian Beach · OPW14/0121
OPW14/0121 and the existing footpath, kerb line and line markings should be completed and submitted to Council prior to any works commencing. 6. All works must be constructed and work procedure undertaken in accordance with: (a) The approved plans and conditions detailed in this Decision Notice. (b) All relevant Noosa Council Planning Scheme Policies, particularly PSP 5 – Engineering Design Standards – Roads, Drainage and Earthworks. (c) Provision of the Work Health and Safety Act and such other legislation as is applicable to workplace health and safety. Driveway Design and Construction 7. The driveway crossover must be in compliance with the approved drawings as listed in the Approved Plans list of this permit. 8. The access crossing and driveway shall be designed and constructed to ensure pedestrian safety using non-slip materials, to produce an evenly graded surface finish, and to be in accordance with the current Australian Standard 1428.1 Design for Access & Mobility. 9. Pavement design for proposed driveway must be undertaken in accordance with the relevant standards and be approved and certified by an RPEQ. The ongoing maintenance, the structural integrity of, and any public liability associated with the driveway and the crossover will remain the responsibility of the property owner. 10. Any upgrade of the existing kerbs within the road reserve must also include upgrading of the existing two pram ramps to be in compliance with the current relevant standard drawings. 11. Upon completion of the works a certificate must be issued by a RPEQ certifying that the works have been constructed in accordance with best engineering practice, the relevant standards, the approved plans and the conditions of this permit. Erosion and Sediment Control 12. Suitable sediment and erosion control measures must be in place prior to works commencing. 13. The applicant must ensure non essential exposure of soil is prevented by restricting the extent of clearing and minimising the duration of soil exposure to adverse weather conditions and effectively turf or stabilise any cleared area without delay and prior to rainfall occurring. 14. The applicant must ensure sediment does not leave the site or ends into the street channel and Council’s drainage system due to surface runoff or on tyres of vehicles. 15. Prior to the completion of the development, all site surfaces must be effectively stabilised using methods which have achieved effective short-term stabilisation and which will continue to achieve effective stabilisation in the medium to long- term. For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination. Page 3 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice OPW14-0121 388 David Low Way Peregian BeachRelated documentApplication case desk ↗
About this file
- File size
- 70 KB (small file)
- File type
No other editions are linked here.