Original source · versioned page text
SCG 31131(SWM).RevB - REceived 3.3.22.pdf
5.2 Construction Phase
Sediment generated during the construction phase shall be controlled in accordance with a site specific
Erosion and Sediment Control (ESC) Plan and kept on site throughout construction.
5.2.1 Silt and Sediment Erosion
A potential for sediment mobilisation/transportation exists during and beyond the construction of the
proposed development. This can elevate turbidity levels of stormwater runoff.
A RUSLE assessment of the site confirms proposed development is a Low Risk for soil loss (< 150
Tonnes).
Potential Causes
• Stormwater scour and erosion of excavated or stripped surfaces and stockpiled soils.
• Wind borne transportation of sediments.
• Disturbance/breakup of soil profile via vehicular traffic followed by stormwater scour
and erosion.
• Transportation of sediments from site via excavation vehicles.
Mitigating Measures
• Construction of silt fences around the development site located to cut off all runoff.
• Construction of a sediment basin throughout construction at a low point of the
development site.
• Provide 80-100mm crushed rock (no fines) hardstand under all vehicle paths expected
during construction. Generally, this would be provided from the existing crossover and
extended to a distance within the site that would accommodate the maximum delivery
vehicle length expected.
SCG Consulting Engineers Page 9 SCG Ref: 31131(SWMP).RevB
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (SCG 31131(SWM).RevB - REceived 3.3.22.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.