• Provide rumble grates at exit points from the site for passing earthmoving vehicles.
• Where possible maintain existing landscaping/grasses downslope from construction areas
to act as buffer/silt trap.
• Install temporary downpipes from completed roof structures and ensure runoff passes
through silt fences.
• Minimise concentrating surface flows.
• Place silt barriers around council stormwater pits that the site drains to.
• Cover soil stockpiles with hessian or similar.
5.3 Completed Development
We are proposing to use a combination of active and passive stormwater treatment measures. Active
measures will include a bio-retention basin and a water storage tank for re-use and passive measures via
gross pollutant inserts into stormwater pits within paved areas that receive runoff from areas prone to
gross pollutants.
5.3.1 Water Quality Objectives
Water quality objectives for South East Queensland are outlined in the State Planning Policy 2017 and
are displayed in Table 5.1. These reductions are achieved by adopting best practice techniques in
accordance with the abovementioned guidelines.
Table 5.1: Minimum Mean Annual Load Reductions
POLLUTANT / ISSUE MINIMAL MEAN ANNUAL LOAD REDUCTIONS
Total Suspended Solids (TSS) 80%
Total Phosphorous (TP) 60%
Total Nitrogen (TN) 45%
Gross Pollutants (GP) 90%
SCG Consulting Engineers Page 10 SCG Ref: 31131(SWMP).RevB
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (SCG 31131(SWM).RevB - REceived 3.3.22.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.