Council archive · source document
SCG 31131(SWM).RevB - REceived 3.3.22 · MCU21/0156
Original PDF page 3, section 1. The text section number identifies this passage in the reader.
Table of Contents
1.0 INTRODUCTION ................................................................................................................................... 3
2.0 EXISTING SITE DESCRIPTION ......................................................................................................... 4
3.0 PROPOSED DEVELOPMENT ............................................................................................................. 5
4.0 EXISTING DRAINAGE.......................................................................................................................... 5
4.1 Existing Drainage and Infrastructure .................................................................................................... 5
4.2 Lawful Point of Discharge ........................................................................................................................... 6
5.0 STORMWATER QUALITY .................................................................................................................. 8
5.1 State Planning Policy and Water by Design Assessment ................................................................. 8
5.2 Construction Phase ....................................................................................................................................... 9
5.2.1 Silt and Sediment Erosion ...................................................................................................................................... 9
5.3 Completed Development.......................................................................................................................... 10
5.3.1 Water Quality Objectives ..................................................................................................................................... 10
5.3.2 Sources of Contaminants ..................................................................................................................................... 11
5.3.3 Proposed Treatment Measures ......................................................................................................................... 13
5.3.4 Pollutant Modelling ................................................................................................................................................ 13
6.0 STORMWATER QUANTITY ............................................................................................................ 15
6.1 Rational Method .......................................................................................................................................... 16
6.1.1 Design Storms........................................................................................................................................................... 16
6.1.2 Rainfall Intensity ..................................................................................................................................................... 16
6.1.3 Time of Concentration .......................................................................................................................................... 16
6.1.4 Runoff Coefficient (C10)......................................................................................................................................... 17
6.1.5 Peak Flows ................................................................................................................................................................. 17
6.2 Proposed Drainage .................................................................................................................................... 18
6.2.1 Catchments ................................................................................................................................................................ 18
6.2.2 Peak Flow Mitigation ............................................................................................................................................. 18
6.3 Hydraulic Modelling (PC Drains) .......................................................................................................... 19
6.3.1 Rainfall Data .............................................................................................................................................................. 19
SCG Consulting Engineers Page 1 SCG Ref: 31131(SWMP).RevB
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SCG 31131(SWM).RevB - REceived 3.3.22.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.