Skip to the record
The gold standard in government transparency.

Council archive · source document

SCG 31131(SWM).RevB - REceived 3.3.22 · MCU21/0156

of 41

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Original PDF page 4, section 1. The text section number identifies this passage in the reader.

       6.3.2      Initial Loss (IL) and Continuing Loss (CL) .................................................................................................... 19

       6.3.3      Configuration ............................................................................................................................................................ 20

       6.3.4      Results ......................................................................................................................................................................... 20

       6.3.5      Total Post Development Mitigated Discharge............................................................................................. 21

   6.4         Downstream Infrastructure Consideration ...................................................................................... 22

   6.5         Climate Change Analysis for 1% AEP Storm Event at Year 2100 .............................................. 22

7.0       FLOODING ........................................................................................................................................... 23
8.0       CONCULSION ...................................................................................................................................... 24
APPENDIX A – Detailed Site Survey ........................................................................................................ 25
APPENDIX B – Proposed Development Plans ..................................................................................... 26
APPENDIX C – Existing Drainage Features and Infrastructure ..................................................... 27
APPENDIX D – Concept Stormwater Management Plan .................................................................. 28
APPENDIX E – Rational Method Calculations ...................................................................................... 29
APPENDIX F – BOM IFD Data ..................................................................................................................... 30




SCG Consulting Engineers                                                     Page 2                                                              SCG Ref: 31131(SWMP).RevB

Used in these records

About this file

File size
6.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SCG 31131(SWM).RevB - REceived 3.3.22.pdf · 6.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.