Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Final Order 25.10.2021

of 31

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

      d.    Provide 1 x 45 litre pot size street tree located to the northern side of the driveway
            crossover.
      e.    Provide a planting and plant schedule including species and pot size.
19.   All landscape works must be established and maintained in accordance with the
      approved design for the life of the development, and in a manner that ensures healthy,
      sustained and vigorous plant growth. All plant material must be allowed to grow to full
      form and be refurbished when its life expectancy is reached.
      Noise
20.   Written certification is required from a suitably qualified person confirming that sound
      pressure levels from all mechanical plant and equipment comply with the following:
      a.    Air-conditioning and Refrigeration
            •      7am to 10pm: Maximum level allowable = background + 5dB(A)
            •      10pm to 7am: Maximum level allowable = background + 3dB(A)
      b.    Pumps
            •      7am to 7pm: Maximum level allowable = background + 5dB(A)
            •      7pm to 10pm: Maximum level allowable = background + 3dB(A)
            •      10pm to 7am: No audible noise.
21.   The certification must be submitted to Council, which certifies that operational noise from
      any fixed plant and equipment complies and with the requirements of this Decision
      Notice.
      HYDROLOGY
      Stormwater Drainage
22.   The site must be provided with a stormwater drainage system connecting to a lawful
      point of discharge. The works must be undertaken in accordance with an Operational
      Works approval and must include in particular:
      a.    a Site Based Stormwater Management Plan which addresses the following:
            i.     existing overland flows and proposed overland flows;
            ii.    maintenance of overland flows within the subject site; and
            iii.   the drainage system for all roofed areas, hardstand, grassed areas and pool
                   surrounds.
      Erosion and Sediment Control
23.   In conjunction with the application for Operational Works approval, provide an erosion
      and sediment control plan, prepared in accordance with Best Practice Erosion and
      Sediment Control (IECA, 2008) and which achieves the construction phase stormwater
      design objectives of the State Planning Policy 2017.
      WASTE DISPOSAL
24.   The developer must provide waste storage and disposal facilities in accordance with
      Planning Scheme Policy 9 - Waste Management. The facilities must include an
      impervious area, within the site, correctly sized for all refuse and recycling containers
      and suitably screened from public places and neighbouring properties. A bin wash area
      is required with a cold-water tap, hose and drain outlet connected to sewer, via a bucket
      trap. The drain outlet must be designed to prevent storm water entry to the sewerage
      system.




                                                                               5642942_1

                                                                                                     4
Log in to download the original file

Final Order 25.10.2021.pdf · 7.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.