Final Order 25.10.2021
25. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
ENGINEERING
External Works
26. Margit Crescent must be upgraded for the length of its frontage to the subject site. The
works, which must be undertaken in accordance with an Operational Works approval,
are:
a. construction of a pedestrian footpath in accordance with the conditions of this
Decision Notice
b. removal of all existing property access (driveway/crossovers) and reinstatement
of the kerb, footpath and verge area to match the balance of the site frontage,
including the provision of topsoil and turf where the existing verge is grassed.
Site Access and Driveways
27. A sealed access driveway must be provided from Margit Crescent to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance
with an Operational Works approval and must include in particular:
a. a driveway crossover in accordance with Council standard drawings RS-051 and
addendums
Car Parking
28. Car parking must be provided generally in accordance with the approved plans. The
works must be undertaken in accordance with an Operational Works approval and must
include in particular:
a. dimensions, crossfalls and gradients in accordance with Australian Standard
AS2890: Parking Facilities
29. Pedestrian facilities must be provided for the development. The works must be
undertaken in accordance with an Operational Works approval and must include in
particular:
a. a 2 metre wide concrete footpath within the road verge for the entire length of the
site’s frontage to Margit Crescent.
This condition is imposed pursuant to s128 of the Planning Act 2016 being necessary
trunk infrastructure identified by Council’s LGIP to service the development.
Easements
30. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
31. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard easement
terms. Draft easement documentation must be submitted to Council for endorsement.
32. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
5642942_1
5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.