21-2999-21 Nannygai St Noosaville-Site Entry-Exit-One Property and Design - Notes and Risk assessment
Attached to the e-mail Operational Works Application OPW21/0213 - 21 Nannygai Street Noosaville (Lot 54 on RP76937).
TRAFFIC CONSIDERATIONS AND CONTROL MEASURES
1. Project Activity/Scope: Site Entry/Exit from building site at #21 Nannygai St
2. Site specific TGS:
21-2999 – Site Entry/Exit
3. TC requirements – Not Required
4. Site Operating Times preferred –24hr times (subject to Permit approval) : 0600-1800 as per One
Property and Design Pty Ltd’s Schedule of Works
5. Project Start Date and duration of job: As per One Property and Design Pty Ltd’s Schedule
of Works
6. Speed: Speed prior to work commencement 50k. Speed has not been reduced as per
attached TGS.
7. How close to the trafficable lanes will the workers be working? >3m
8. Highlight D Value
Table 4.2 – Value of Dimension D (m)
dimension D Speed limit¹
(km/h)
40 or less 5 to 10
50 10 to 15
60 15 to 45
70, 80 60 to 80
90, 100 80 to 100
110 100 to 120
9. Direction of Closure: All directions
10. Is there open Excavation? No
What’s Depth of excavation?
Width Excavation?
Length Excavation?
Is barrier System required?
Barrier System selected?
Are Steel Plates being used?
Table E1 – Protection / delineation adjacent to excavations
Issued: Traffic Guidance Scheme & Scope of Works Uncontrolled when printed
Revised: Version 1 Author: Shaylene Rubach Approved by: Wayne Grice Page 2 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.