21-2999-21 Nannygai St Noosaville-Site Entry-Exit-One Property and Design - Notes and Risk assessment
Attached to the e-mail Operational Works Application OPW21/0213 - 21 Nannygai Street Noosaville (Lot 54 on RP76937).
33. Scope of works and TGS: The controlled version of this Scope of works and TGS will be held
electronically by Aaction Traffic Control Pty Ltd and will be made available to all project
personnel. Aaction Traffic TMD will maintain, review and update Scope of works and TGS
34. Review: TGS and Scope of works be reviewed every twelve months from the date of issue.
35. TGS Risk Assessment
SAFETY AND ENVIRONMENTAL HAZARD IDENTIFICATION/RISK ASSESSMENT
LIKELIHOOD CONSEQUENCE
Almost Event will occur on a Catastrophic Safety: Fatality/ Multiple Fatalities or significant irreversible effects
Certain yearly basis Revenue: High Financial Impact
Likely Event has occurred Major Safety: Severe irreversible to 1 or more persons
several times or more in Revenue: Medium Financial Impact
your career
Possible Event might occur once Moderate Safety: Moderate irreversible disability or impairment to 1 or more
in a year persons
Revenue: Medium Financial Impact
Unlikely Event does not occur Minor Safety: Objective but reversible disability requiring hospitalisation
somewhere from time to Revenue: Low Financial Impact
time
Rare Heard of something like Insignificant Safety: No medical treatment, no damage to equipment
the event occurring Revenue: Low Financial Impact
somewhere
CONSEQUENCE
Likelihood
Insignif. (1) Minor (2) Modera. (3) Major (4) Catastr. (5)
Almost Certain (5) 3 3 4 4 4
Likely (4) 2 3 3 4 4
Possible (3) 1 2 3 4 4
Unlikely (2) 1 2 2 3 4
Rare (1) 1 2 2 3 3
4 Very High (VH) URGENT - Stop work immediately, the risk requires immediate attention
3 High (H) Continue with supervision and control measures in SWMS or site risk assessment
2 Medium (M) Use control measures to ensure risk is low as reasonable possible
1 Low (L) Manage by routine procedures and safe practices
RA-TGS PREPARATION HIERARCHY OF CONTROL
Project Coordinator completes TGS in To properly manage exposure to foreseeable risks a person on
accordance with Aaction Traffic and DTMR location, consider the appropriateness of control measures in the
(MUTCD) standards and client requests (OPS- following descending order of effectiveness:
FORM-008) • Elimination: Elimination the hazard entirely
↓ • Substitution: If not possible to remove, minimise the risk
Project Coordinator prepares RA-TGS as per by substitution of a lesser risk.
drawings • Isolation: Isolating the hazard giving rise to the risk
↓ • Engineering: Minimise the risk by engineering means
Identify risks/impacts associated with each • Administration: Applying administrative measures
activity step • Personal: Protective Equipment: Wear appropriate PPE
at the worksite
Issued: Traffic Guidance Scheme & Scope of Works Uncontrolled when printed
Revised: Version 1 Author: Shaylene Rubach Approved by: Wayne Grice Page 7 of 9