Original source · versioned page text
Appendix C - SPP and SDAP Checklists
Matters of State Type Referral Relevant Relevant State SARA Referral
Interest Required Provisions of Codes or Non-SARA
the Regulation Referral
transport State code 1:
corridor) Development in a
state-controlled
Schedule 10,
road environment
Part 9, Division
4, Subdivision 2, In near a railway
Table 6 (Future corridor or future
State transport railway corridor:
corridor)
State code 2:
Development in a
railway
environment
If near a busway
corridor or future
busway corridor:
State code 3:
Development in a
busway
environment
If near a light rail
corridor or future
light rail corridor:
State code 4:
Development in a
light rail
environment
State-controlled RoL on or near No Schedule 10, State code 5: SARA Referral
transport tunnels a State- Part 9, Division Development in a
and future State- controlled 4, Subdivision 3, state-controlled
controlled transport tunnel Table 1 transport tunnel
transport tunnels or future State- environment
controlled
transport tunnel
MCU on or No Schedule 10, SARA Referral
near a State- Part 9, Division
controlled 4, Subdivision 3,
transport tunnel Table 2
or future State-
controlled
transport tunnel
5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.