Original source · versioned page text
Appendix C - SPP and SDAP Checklists
Matters of State Type Referral Relevant Relevant State SARA Referral
Interest Required Provisions of Codes or Non-SARA
the Regulation Referral
If near a light rail
corridor or future
light rail corridor:
State code 4:
Development in a
light rail
environment
MCU near a No Schedule 10, If near a state SARA Referral
State transport Part 9, Division controlled road
corridor or that 4, Subdivision 2, or future state
is a future State Table 4 controlled road:
transport
State code 1:
corridor
Development in a
state-controlled
road environment
If near a railway
corridor or future
railway corridor:
State code 2:
Development in a
railway
environment
If near a busway
corridor or future
busway corridor:
State code 3:
Development in a
busway
environment
If near a light rail
corridor or future
light rail corridor:
State code 4:
Development in a
light rail
environment
Op. Works No Schedule 10, If near a state SARA Referral
Part 9, Division controlled road
4, Subdivision 2, or future state
Table 5 (State controlled road:
4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.