Original source · versioned page text
Appendix C - SPP and SDAP Checklists
Matters of State Type Referral Relevant Relevant State SARA Referral
Interest Required Provisions of Codes or Non-SARA
the Regulation Referral
Op. Works No Schedule 10, Non-SARA
Part 9, Division Referral
2, Table 3
Oil and Gas RoL No Schedule 10, N/A Non-SARA
Infrastructure Part 9, Division Referral
3, Table 1
MCU No Schedule 10, Non-SARA
Part 9, Division Referral
3, Table 2
Op. Works No Schedule 10, Non-SARA
Part 9, Division Referral
3, Table 3
State Transport Various No Schedule 10, State code 6: SARA Referral
Infrastructure aspects of Dev. Part 9, Division Protection of state
(thresholds) 4, Subdivision 1, transport networks
Table 1
State Transport RoL near a No Schedule 10, If near a state SARA Referral
Corridors and State transport Part 9, Division controlled road
Future Transport corridor 4, Subdivision 2, or future state
Corridors
Table 1 controlled road:
RoL that is a No Schedule 10, State code 1: SARA Referral
future State Part 9, Division Development in a
transport 4, Subdivision 2, state-controlled
corridor Table 2 road environment
RoL near a No Schedule 10, If near a railway SARA Referral
State-controlled Part 9, Division corridor or future
road 4, Subdivision 2, railway corridor:
intersection Table 3 State code 2:
Development in a
railway
environment
If near a busway
corridor or future
busway corridor:
State code 3:
Development in a
busway
environment
3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.