Original source · versioned page text
Attachment 3 - Stormwater Management Plan
Plans and drawings: the text below has words only, no drawings.
2. A shakedown area is to be installed at the construction entry/exit to the proposed development area to
minimise sediment being transported to and from the site.
3. Downstream pits within the road reserve are to be protected through filter socks or similar.
4. Diversion of upstream catchments around any exposed areas using diversion drains around the site.
4.2. Operational Phase
The development consists of replacing the existing dwelling located on a parcel of a small lot duplex consistent.
The proposed development is not considered to significantly alter the pollutant generation potential of the site,
and therefore no additional stormwater quality treatment is proposed for the development.
Project number 20220116
File RECOR Preliminary Stormwater Management Report - 20220116.docx, 2022-09-27 Page 10 of 14
Revision 1
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads, Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.