 CONCLUSION
This Stormwater Management Report has outlined how the stormwater run-off from the site is to be managed to
comply with the relevant requirements and minimise any adverse impacts to the downstream catchments.

     •    The proposed site roof run-off, impervious areas and upstream run-off is captured and conveyed via an
          internal drainage network, which discharges south into the Martin Street road reserve. Remaining areas of
          the site will rely on infiltration into the typically sandy soils of the locality in a manner consistent with the
          existing drainage conditions.

     •    The lawful point of discharge for the development will be via an outlet into the Martin Street road reserve, to
          which the site currently drains.

     •    The existing and proposed development site have been modelled for the critical design storm events for the
          site, which found that only minor peak flow increases would arise for a small number of storm events. The
          overall increase is deemed to be insignificant and unlikely to result in significant impacts to downstream
          properties and infrastructure therefore no attenuation is considered to be necessary.

     •    During construction, erosion and sediment control measures are to be implemented to minimise potential
          contaminants impacting the downstream receiving environment in line with the objectives of Appendix 2 of
          the SPP. An erosion and sediment control plan shall be developed as part of a submission for Operational
          Works approvals.

     •    As the development is a small residential site that does not significantly alter the pollutant generating
          characteristics of the site, stormwater quality treatment is not proposed for the development.

     •    The proposed stormwater solution is considered to minimise any adverse impacts to the downstream
          environment arising from the stormwater run-off while also meeting the stormwater objectives for the
          development.




Project number 20220116
File RECOR Preliminary Stormwater Management Report - 20220116.docx, 2022-09-27                                Page 11 of 14
Revision 1


P +61 7 5211 1003                 A 75 Noosa Drive, Noosa Heads, Qld 4567         E [email protected]    recorconsulting.com
Log in to download the original file

Attachment 3 - Stormwater Management Plan.pdf · 2.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.