                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST


                                       Acceptable Solutions (if self-
Specific Outcomes                      assessable)                             Proposed Measures
                                       Probable Solutions
                                       (if code assessable)

                                       S4.2 Earthworks are undertaken          All works will be conducted within
                                       only during the hours of 7am to         the designated timeframes.
                                       6pm, Monday to Friday and 7am
                                       to 6pm on Saturday. No work is
                                       undertaken on Sunday or public
                                       holidays.
Vegetative Waste
O5 Vegetation cleared from a           S5.1      Cleared vegetation is         Vegetation will be used or
development site is disposed of        transported off-site for disposal in    disposed of in an environmentally
in     an      environmentally         an approved green waste disposal        responsible manner.
responsible manner.                    facility;
                                       OR
                                       S5.2     Cleared vegetation is
                                       mulched onsite and reused for
                                       landscaping of the finished
                                       development;
                                       OR
                                       S5.3      Cleared vegetation is
                                       disposed of for the purpose of
                                       firewood.
Managing Contamination Risk
O6 Materials used as fill are          S6.1 The fill material is sold clean    It is proposed to aim for balanced
suitable for development of the        earth, free of putrescible or refuse    earthworks      within   the    site.
land and filling or excavation         material, vegetation, acid sulfate      However, if fill material is
works do not result in the             soils, building or construction         required, it will be investigated by
contamination of land.                 material or other material of           geotechnical engineer to ensure
                                       contaminants.                           that it is satisfactory prior to
                                       OR                                      placement.
                                       S6.2   The site is not on the
                                       contaminated land register.
Haulage Activity & Amenity
O7 Haulage of material to and          No solution provided.                   Refer to O6 above - Haulage will
from a site ensures:                                                           be     undertaken       with due
(a) minimal disturbance to                                                     consideration to residents and
    neighbouring     properties                                                Council’s infrastructure.
    and properties along the
    haulage route; and
(b) Council’s              road
    infrastructure    including
    pavements is not adversely
    affected.
Extent of Earthworks
O8 Earthworks are contained            S8.1 All earthworks, including cut      Cut and fill batters will be
within the site.                       and fill batters, retaining walls etc   contained   within  the   site
                                       are contained within the subject        boundaries.
                                       site.

Environmental Protection
O9 Earthworks minimise any             No solution provided.                   Earthworks will be minimised to
adverse       impact      upon                                                 limit the impact on groundwater
groundwater,       watercourse,                                                and watercourses.
drainage lines, wetlands, and
native vegetation.



DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                         PAGE   10

Used in these records

About this file

File size
354 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Engineering report [As Published].pdf · 354 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.