BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST
Acceptable Solutions (if self-
Specific Outcomes assessable) Proposed Measures
Probable Solutions
(if code assessable)
S4.2 Earthworks are undertaken All works will be conducted within
only during the hours of 7am to the designated timeframes.
6pm, Monday to Friday and 7am
to 6pm on Saturday. No work is
undertaken on Sunday or public
holidays.
Vegetative Waste
O5 Vegetation cleared from a S5.1 Cleared vegetation is Vegetation will be used or
development site is disposed of transported off-site for disposal in disposed of in an environmentally
in an environmentally an approved green waste disposal responsible manner.
responsible manner. facility;
OR
S5.2 Cleared vegetation is
mulched onsite and reused for
landscaping of the finished
development;
OR
S5.3 Cleared vegetation is
disposed of for the purpose of
firewood.
Managing Contamination Risk
O6 Materials used as fill are S6.1 The fill material is sold clean It is proposed to aim for balanced
suitable for development of the earth, free of putrescible or refuse earthworks within the site.
land and filling or excavation material, vegetation, acid sulfate However, if fill material is
works do not result in the soils, building or construction required, it will be investigated by
contamination of land. material or other material of geotechnical engineer to ensure
contaminants. that it is satisfactory prior to
OR placement.
S6.2 The site is not on the
contaminated land register.
Haulage Activity & Amenity
O7 Haulage of material to and No solution provided. Refer to O6 above - Haulage will
from a site ensures: be undertaken with due
(a) minimal disturbance to consideration to residents and
neighbouring properties Council’s infrastructure.
and properties along the
haulage route; and
(b) Council’s road
infrastructure including
pavements is not adversely
affected.
Extent of Earthworks
O8 Earthworks are contained S8.1 All earthworks, including cut Cut and fill batters will be
within the site. and fill batters, retaining walls etc contained within the site
are contained within the subject boundaries.
site.
Environmental Protection
O9 Earthworks minimise any No solution provided. Earthworks will be minimised to
adverse impact upon limit the impact on groundwater
groundwater, watercourse, and watercourses.
drainage lines, wetlands, and
native vegetation.
DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY PAGE 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Engineering report [As Published]Related documentApplication case desk ↗
About this file
- File size
- 354 KB (small file)
- File type
No other editions are linked here.