Council archive · source document
Engineering report [As Published] · 132007.2398
BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST
Acceptable Solutions (if self-
Specific Outcomes assessable) Proposed Measures
Probable Solutions
(if code assessable)
Dams
O10 Dam location and No solution provided. Existing dams on site will be
construction does not impact improved through re-shaping and
upon neighbouring properties landscaping works as part of the
in terms of: stormwater treatment train
(a) hydrology; solution. Refer to Brown Report
(b) alteration of existing Oct 2007.
overland flowpaths and
patterns;
(c) landslide or failure of dam
wall; and
(d) effluent disposal areas.
DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY PAGE 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Engineering report [As Published]Related documentApplication case desk ↗
About this file
- File size
- 354 KB (small file)
- File type
No other editions are linked here.