Council archive · source document
Engineering report [As Published] · 132007.2398
BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST
DIVISION 16: EXISTING SERVICES CODE
Table 14-51 Existing Services
Specific Outcomes Probable Solutions Proposed Measures
(if code assessable)
Setbacks and Easements
O1 Development near a sewer, S1.1 The footing of any structure Due consideration for all
water main, stormwater drain, or building is located clear of the infrastructure and existing flow
overland flow path or zone of influence but no closer paths will occur throughout the
associated structure does not: than 15.m (measured horizontally) detailed design process.
(a) adversely affect the from infrastructure including
function of the service; sewers, water mains and
(b) place an additional load on stormwater structures;
the service; and AND
(c) unduly increase future S1.2 No building of structure
maintenance costs. overhangs the zone of influence;
AND
S1.3 Finished surface levels
maintain a minimum of 600mm of
cover, but not greater than 3m of
cover to the underground
infrastructure;
AND
S1.4 If the existing surface level
is altered, surface level services
including manholes and
inspection points are altered to
match the new surface level;
AND
S1.5 Alterations are constructed
in accordance with Sections 3, 4
and 5 of PSP6 – Engineering
Design Standards –Water and
Sewerage and Section 4 of
PSPs5 – Engineering Design
Standards – Roads, Drainage and
Earthworks;
OR
S1.6 Existing services are
relocated and the design and
construction of the relocated
services is in accordance with
Sections 3, 4 and 5 of PSP 6 –
Engineering Design Standards –
Water and Sewerage and Section
4 of PSP 5 – Engineering Design
Standards – Roads, Drainage and
Earthworks.
O2 Maintenance access is S2.1 A registered easement in Due consideration will be given to
provided to all sewers, water favour of Council is created over the requirements of access for
mains, stormwater drains, all underground infrastructure future maintenance throughout
overland flow paths and located in private property; the detailed design process.
associated structures. AND
S2.2 The width of the easement
is in the greater of 3m or the width
of the zone of influence;
AND
DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY PAGE 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Engineering report [As Published]Related documentApplication case desk ↗
About this file
- File size
- 354 KB (small file)
- File type
No other editions are linked here.