Engineering report [As Published] · 132007.2398

of 27

Text shows just the words. Original shows the document exactly as it was published.

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST



Specific Outcomes                      Probable Solutions                      Proposed Measures
                                       (if code assessable)
                                       S2.3 The easement is centred
                                       over the centreline of the
                                       infrastructure.



DIVISION 18: TRANSPORTS, ROADS AND DRAINAGE CODE

Table 14-55 Strategic Transport Network


Specific Outcomes                      Probable Solutions                      Proposed Measures
                                       (if code assessable)
14.163  Strategic        Transport
Network
O1 Traffic generation from the         S1.1     Where the development          A        traffic     management
development is considered in a         leads to the need to increase           investigation has been undertaken
localised and a Shire wide             transport infrastructure in the         by others.       Please refer to
context to ensure that:                Shire,       the      development       associated report.
(a) the transport network has          contributes to the transport
    the capacity to safely and         network in accordance with the
    efficiently   accommodate          requirements of Infrastructure
    projected       movements;         Charges Plans (ICP); and where
    and/or                             developments              requires
(b) the development includes           infrastructure not included in the
    measure to upgrade the             ICP, the development upgrades
    transport network to meet          the infrastructure at no cost to
    the imposed demands.               Council.

O2 Development is designed             No solution provided.                   Aged care facilities and retirement
and located to avoid excessive                                                 villages are low traffic generating
travel for users.                                                              developments.        The site is
                                                                               proximate to facilities within the
                                                                               Cooroy Town Centre. RSL Care
                                                                               will also provide a bus service
                                                                               from the site to take residents to
                                                                               nearby venues.
O3 Development is designed:            S3.1 Facilities for boarding and        The development has a network
(a) to encourage travel by             exiting   community         transport   of pedestrian paths within the site
    community        transport,        services    and     facilities   are    that link to external pathways. As
    walking and cycling rather         incorporated into developments.         noted above, RSL Care will
    than by car; and                                                           provide a bus service for
(b) to maximise accessibility                                                  residents.
    via existing and planned
    community         transport
    facilities.
O4 Development access does             No solution provided.                   A        traffic     management
not compromise the functions                                                   investigation has been undertaken
of particular roads as indicated                                               by others.       Please refer to
in Noosa Shire hierarchy, and                                                  associated report.
does not adversely impact on
the    safety,   capacity   and
operations of the road system.




DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                         PAGE   15

Used in these records

About this file

File size
354 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Engineering report [As Published].pdf · 354 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.