Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Engineering report [As Published] · 132007.2398

of 27

Text shows just the words. Original shows the document exactly as it was published.

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST



Specific Outcomes                      Probable Solutions                      Proposed Measures
                                       (if code assessable)
         delineating         the       S5.4 The provision of bicycle
         carriageway for all           lanes at intersections is generally
         users;                        in accordance with AUSTROADS
    ii. conveys             road       Part 14, Section 5 and the Manual
         pavement runoff to            of     Urban    Traffic    Devices
         stormwater drainage in        (MUTCD) Part 9.
         a manner that allows
         the     road    to    be
         trafficable in Q100 ARI
         local rainfall events;
         and
(d) verges and footpaths;
    i.   safe      access     for
         pedestrians         and
         cyclists     clear    of
         obstructions;
    ii. an access area        for
         vehicles           onto
         properties;
    iii. a corridor allocated for
         services and utilities;
         and
    iv. additional amenity for
         minor roads.
O6        Stormwater drainage          S6.1       Stormwater drainage          Stormwater drainage will be
infrastructure     is     planned,     planning, design and construction       designed in accordance with
designed and constructed to:           is in accordance with Section 4 of      Council requirements and with
(a) be       accessible,      cost     PSP 5 Engineering Design                consideration to the stormwater
     effective     and       easily    Standards – Roads, Drainage and         management plan.
     maintained.                       Earthworks;
(b) Protect           downstream       AND
     capacity;
                                       S6.2    As constructed data is
(c) Protect downstream water
                                       submitted in accordance with
     quality;
                                       Section 6 of PSP 5 Engineering
(d) Maximise                onsite     Design Standards – Roads,
     stormwater retention and          Drainage and Earthworks;
     retardation; and
                                       AND
(e) Convey          runoff       to
     stormwater drainage in a          S6.3       Stormwater drainage
     manner that allows roads          planning, design and construction
     to be trafficable in Q100         is in accordance with the
     ARI local rainfall events.        Queensland     Urban   Drainage
                                       Design Manual.
O7     Road and stormwater             S7.1      Road and stormwater           Roads and the stormwater
drainage     infrastructure    is      drainage       infrastructure      is   networks will be designed in
constructed:                           constructed in accordance with:         accordance     with   Council
(a) in     accordance       with       (a) Sections 2,3 and 4 of PSP5          requirements.
    appropriate      engineering            Engineering              Design
    standards; and                          Standards – Roads, Drainage
(b) to    minimise       adverse            and Earthworks;
    environmental       impacts,       (b) Queensland Design Code for
    including from runoff and               Residential Streets;
    erosion.                           (c) AUSTROADS; or
                                       (d) A      combination     of    the
                                            principles       of       these
                                            documents.
                                       AND




DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                         PAGE   17

Used in these records

About this file

File size
354 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Engineering report [As Published].pdf · 354 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.