BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST
Table 14-56 Roads and Drainage
Specific Outcomes Probable Solutions Proposed Measures
(if code assessable)
14.164 Road and drainage
design and construction.
O5 Roads and pedestrian and S5.1 Road planning and design A traffic management
cycle paths are planned and supports the hierarchy and investigation has been undertaken
designed to support the functional aspects identified in by others. Please refer to
hierarchy and functional Sections 2 and 3 of PSP5 associated report.
aspects identified in Sections 2 Engineering Design Standards – All roads will be designed in
and 3 of PSP5 Engineering Roads, Drainage and Earthworks; accordance with relevant Council
Design Standards – Roads, AND policies and engineering
Drainage and Earthworks and guidelines.
to ensure that:
S5.2 Road and pathway planning
(a) design and alignment of
and design is in accordance with,
the roads, intersections
in order of precedence:
and all associated works:
i. provides a safe
environment for all (a) Noosa Integrated
users; Local Transport Plan;
ii. is adequate for the (b) Queensland
design speed Transport’s Shaping
environment; Up;
iii. is adequate for (c) Queensland Design
predicted traffic Code for Residential
volumes; and Streets;
iv. maintains the safe and (d) AUSTROADS Guide
efficient functioning of to Traffic Engineering
the road network Practice;
without the use of (e) Sections 2 and 3 of
traffic signals; PSPS 5 Engineering
v. is compatible with Design Standards –
existing roads; Roads, Drainage,
vi. is easily maintained by Earthworks; or
Council equipment; (f) The Noosa Cycling
and and Walking Network
vii. where appropriate, has Development Plan;
the ability to or
accommodate public (g) A combination of the
transport services. principles in these
(b) Road pavement surfaces: documents.
i. are durable enough to AND
carry estimated wheel
S5.3 On road cycling treatment is
loads of travelling and
utilised to provide safe and
parked vehicles;
continuous movement of cyclist
ii. provide for the safe along a roadway, such as:
passage of vehicles;
(a) sealed shoulders;
pedestrians, cyclist
and discharge of (b) wide kerbside lane;
stormwater runoff (c) exclusive or peak period
from contributing bicycle lane;
catchments and the (d) advisory treatments such as
preservation of all Bicycle Awareness Zone;
weather access; (e) shared parking/bicycle lane;
(c) kerb and channel: (f) contra flow bicycle lane; and
i. controls vehicle (g) bus/bicycle lane.
movement by
DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY PAGE 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Engineering report [As Published]Related documentApplication case desk ↗
About this file
- File size
- 354 KB (small file)
- File type
No other editions are linked here.