                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST




DIVISION 20: WATER SUPPLY AND SEWERAGE RETICULATION CODE

Table 14-59 Water Supply


Specific Outcomes                      Probable Solutions                     Proposed Measures
                                       (if code assessable)
14.181 Design and Construction
(Water)

O1 Water Supply Infrastructure         S1.1 Water supply infrastructure       A water supply analysis has been
                                       is designed in accordance with         undertaken. The results of the
(a) Meets the needs of the
                                       Section 3 of PSP 6 – Engineering       study indicate that sufficient
    users;
                                       Design Standards – Water and           capacity is available for the
(b) Is designed to be                  Sewerage and As Constructed            proposed development.
    compatible with existing           data submitted in accordance with
    infrastructure; and                Section 7 of PSP 6 – Engineering
                                       Design Standards – Water and
(c) Is deigned using materials         Sewerage.
    that are suitable for the
    use, durable, easy to
    maintain and cost effective,
    taking into account the
    whole of life cycle cost and
    Council’s maintenance
    inventory.

O2 Water supply infrastructure         S2.1 Water supply infrastructure       All water supply infrastructure will
is constructed:                        is constructed in accordance with      be constructed and tested in
                                       Section 6 of PSP 6 – Engineering       accordance with Council
(a) in accordance with
                                       Design Standards – Water and           requirements.
    appropriate engineering
                                       Sewerage;
    standards; and
                                       AND
(b) to minimise adverse
    environmental impacts.

                                       S2.2 Erosion and Sediment              Erosion and sediment control
                                       control measures are designed          measures will be prepared as part
                                       and implemented in accordance          of the operational works (civil)
                                       with the Institution of Engineers      design drawings.
                                       Australia (Qld Division) Soil
                                       Erosion and Sediment Control –
                                       Guidelines for Queensland
                                       Construction Sites.

O3 Water supply infrastructure         No solution provided.                  Water supply infrastructure will be
is proven to be suitable for its                                              constructed and tested to
use prior to Council accepting                                                Council’s satisfaction prior to hand
the dedicated asset.                                                          over.

O4 Water supply infrastructure         No solution provided.                  Water supply infrastructure will be
is provided with all supporting                                               supported by all required technical
technical documentation.                                                      documentation.

O5 Where buildings or other            S5.1 The footing of any building       All existing infrastructure will be
structures are in proximity to         or structure is located clear of the   protected from the proposed
Council’s water supply                 zone of influence but no closer        works.
infrastructure, provision is           than 1.5m (measured horizontally)
made to protect the                    from infrastructure including
infrastructure from physical           sewers, water mains and
damage and to allow ongoing            stormwater structures.
maintenance by Council.
                                       AND



DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                         PAGE     23

Used in these records

About this file

File size
354 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Engineering report [As Published].pdf · 354 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.