Council archive · source document
Engineering report [As Published] · 132007.2398
BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST
Specific Outcomes Probable Solutions Proposed Measures
(if code assessable)
S5.2 A registered easement in
favour of Council is created over
all underground infrastructure
located in private property;
AND
S5.3 The width of the easement
is the greater of 3m or the width of
the zone of influence;
AND
S5.4 The easement is centred
over the centreline of the
infrastructure.
O6 Alignment of water supply S6.1 Infrastructure is designed Detailed design considerations
infrastructure allows for easy and constructed on the preferred will ensure ease of maintenance
access for the ongoing alignments in accordance with is achieved.
maintenance by Council. Section 3 of PSP 6 Engineering
Design Standards – Water and
Sewerage.
O7 Any alterations or repairs to S7.1 Any alterations or repairs to Existing infrastructure will be
infrastructure as a result of the infrastructure as a result of the protected at all times. Any
development are made at no development are completed at the changes will be rectified at the
cost to the Council. developer’s expense. developer’s expense.
14.183 Design and Construction
Sewer
O8 Sewerage Reticulation S1.1 Sewerage Reticulation Sewer infrastructure will be
Infrastructure infrastructure is designed in designed to cater for the intended
accordance with Sections 4 and 5 load and will be compatible with
(a) Meets the needs of the
of PSP 6 – Engineering Design existing infrastructure.
users;
Standards – Water and
(b) Is designed to be Sewerage.
compatible with existing
infrastructure; and
(c) Is designed using materials
that are suitable for the
use, durable, easy to
maintain and cost effective,
taking into account the
whole of life cycle cost and
Council’s maintenance
inventory.
O9 Sewerage Reticulation S9.1 Sewerage Reticulation Sewer infrastructure will be
infrastructure is constructed: infrastructure is constructed in designed in accordance with
accordance with Section 6 of PSP Council requirements and general
(a) in accordance with
6 – Engineering Design Standards engineering principles.
appropriate engineering
– Water and Sewerage and As
standards; and
Constructed data submitted in
(b) to minimise adverse accordance with Section 7 of PSP
environmental impacts. 6 – Engineering Design Standards
– Water and Sewerage;
AND
DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY PAGE 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Engineering report [As Published]Related documentApplication case desk ↗
About this file
- File size
- 354 KB (small file)
- File type
No other editions are linked here.