Skip to the record
Accept no imitations.

Council archive · source document

Engineering report [As Published] · 132007.2398

of 27

Text shows just the words. Original shows the document exactly as it was published.

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST



Specific Outcomes                      Probable Solutions                     Proposed Measures
                                       (if code assessable)
                                       S5.2 A registered easement in
                                       favour of Council is created over
                                       all underground infrastructure
                                       located in private property;
                                       AND

                                       S5.3 The width of the easement
                                       is the greater of 3m or the width of
                                       the zone of influence;
                                       AND

                                       S5.4 The easement is centred
                                       over the centreline of the
                                       infrastructure.

O6 Alignment of water supply           S6.1 Infrastructure is designed        Detailed design considerations
infrastructure allows for easy         and constructed on the preferred       will ensure ease of maintenance
access for the ongoing                 alignments in accordance with          is achieved.
maintenance by Council.                Section 3 of PSP 6 Engineering
                                       Design Standards – Water and
                                       Sewerage.

O7 Any alterations or repairs to       S7.1 Any alterations or repairs to     Existing infrastructure will be
infrastructure as a result of the      infrastructure as a result of the      protected at all times. Any
development are made at no             development are completed at the       changes will be rectified at the
cost to the Council.                   developer’s expense.                   developer’s expense.
14.183 Design and Construction
Sewer

O8 Sewerage Reticulation               S1.1 Sewerage Reticulation             Sewer infrastructure will be
Infrastructure                         infrastructure is designed in          designed to cater for the intended
                                       accordance with Sections 4 and 5       load and will be compatible with
(a) Meets the needs of the
                                       of PSP 6 – Engineering Design          existing infrastructure.
    users;
                                       Standards – Water and
(b) Is designed to be                  Sewerage.
    compatible with existing
    infrastructure; and
(c) Is designed using materials
    that are suitable for the
    use, durable, easy to
    maintain and cost effective,
    taking into account the
    whole of life cycle cost and
    Council’s maintenance
    inventory.



O9 Sewerage Reticulation               S9.1 Sewerage Reticulation             Sewer infrastructure will be
infrastructure is constructed:         infrastructure is constructed in       designed in accordance with
                                       accordance with Section 6 of PSP       Council requirements and general
(a) in accordance with
                                       6 – Engineering Design Standards       engineering principles.
    appropriate engineering
                                       – Water and Sewerage and As
    standards; and
                                       Constructed data submitted in
(b) to minimise adverse                accordance with Section 7 of PSP
    environmental impacts.             6 – Engineering Design Standards
                                       – Water and Sewerage;
                                       AND




DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                         PAGE   24

Used in these records

About this file

File size
354 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Engineering report [As Published].pdf · 354 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.