Council archive · source document
Engineering report [As Published] · 132007.2398
BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST
Specific Outcomes Probable Solutions Proposed Measures
(if code assessable)
S9.2 Erosion and Sediment
control measures are designed
and implemented in accordance
with the Institution of Engineers
Australia (Qld Division) Soil
Erosion and Sediment Control –
Guidelines for Queensland
Construction Sites.
O10 Sewerage Reticulation No solution provided. Sewer infrastructure will be tested
infrastructure is proven to be and inspected to Council’s
suitable for its use prior to satisfaction prior to hand over.
Council accepting the
dedicated asset.
O11 Sewerage Reticulation No solution provided. All supporting documentation will
supply infrastructure is be provided.
provided with all supporting
technical documentation.
O12 Where buildings or other S12.1 The footing of any building All existing infrastructure will be
structures are in proximity to or structure is located clear of the protected from the proposed
Council’s water supply zone of influence but no closer works.
infrastructure, provision is than 1.5m (measured horizontally)
made to protect the from infrastructure including
infrastructure from physical sewers, water mains and
damage and to allow ongoing stormwater structures.
maintenance by Council.
AND
S12.2 A registered easement in
favour of Council is created over
all underground infrastructure
located in private property;
AND
S12.3 The width of the easement
is the greater of 3m or the width of
the zone of influence;
AND
S12.4 The easement is centred
over the centreline of the
infrastructure.
O13 Alignment of sewerage S13.1 Infrastructure is Detailed design considerations
reticulation infrastructure is to constructed on the preferred will ensure ease of maintenance
allow for easy access for the alignments in accordance with is achieved.
ongoing maintenance by Section 4 of PSP 6 – Engineering
Council. Design Standards – Water and
Sewerage.
O14 Any alterations or repairs S14.1 Any alterations or repair to Existing infrastructure will be
to infrastructure as a result of infrastructure as a result of the protected at all times. Any
the development are made at development are completed at the changes will be rectified at the
no cost to Council. developer’s expense. developer’s expense.
DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY PAGE 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Engineering report [As Published]Related documentApplication case desk ↗
About this file
- File size
- 354 KB (small file)
- File type
No other editions are linked here.