Council archive · source document
Engineering report [As Published] · 132007.2398
BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST 1. INTRODUCTION The project comprises the development of a Residential Aged Care Facility and a Retirement Village for RSL Care at Cooroy. The development is made up of independent living units and aged care facilities. The main entrance to the development is off Trading Post Road. The proposal also features a village centre and two water bodies that will act as stormwater treatment devices. From an engineering perspective, generally the development can be serviced by the existing infrastructure with little or no upgrade requirements. In light of this fact, we see no reason why the development should not be approved on engineering grounds. 2. EARTHWORKS The earthworks will be limited to that required for roadworks, allotment access and the installation of services. The allotments will be left as close as possible to existing surface levels to preserve the existing vegetation and minimise disturbance to the site. 3. STORMWATER DRAINAGE Stormwater will discharge into the existing gullies in accordance with the proposed Site Based Stormwater Management Plan. Detention storage and quality objectives will be satisfied via the treatment measures set out in the management plan. 4. SEWERAGE RETICULATION This site is within an area currently sewered by Council. Sewerage to the site will be via a connection in Pearson Road. The 150mm diameter line runs along the northern side of Pearson Road and terminates on the eastern corner of the subject site. The development will require a pump station. The most likely location will be in the north east corner of the site. Confirmation of the final location will be addressed in the operational works design. The location of the connection points are shown on the attached drawing N07058-DA10. 5. WATER RETICULATION Water reticulation for the site is a 150mm diameter main that terminates approximately 30 metres into Trading Post Road. The location of the connection points are shown on the attached drawing N07058-DA11. DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY PAGE 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Engineering report [As Published]Related documentApplication case desk ↗
About this file
- File size
- 354 KB (small file)
- File type
No other editions are linked here.