Council archive · source document
Engineering report [As Published] · 132007.2398
BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST 6. CONCLUSION This report is based on Council as constructed information and discussions with Council. In addition, a network analysis has been undertaken by JWP. The analysis concludes by advising that both the existing sewer and water systems have capacity to facilitate the development. The following codes and probable solutions primarily relate to matters which would ordinarily be addressed as part of the detailed design phase for operational works approval. However the matters have been reviewed as part of the preliminary design considerations during the master planning for the site to ensure that all relevant measures can be satisfied in accordance with good engineering practices and the design standards otherwise expressed within the codes. DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY PAGE 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Engineering report [As Published]Related documentApplication case desk ↗
About this file
- File size
- 354 KB (small file)
- File type
No other editions are linked here.