Original source · versioned page text
Planning Report
Attached to the e-mail MCU15/0111 & REC15/0031 Development Application - Cover letter & Planning report Email 1 of 8.
PROPOSED
Additional Independent Living Units 56
Additional Ancillary Facilities caretakers, golf room and caravan storage
TOTAL
Independent Living Units 220
Aged Care Beds 120
Ancillary Facilities clubhouse, covered bowling green, tennis court,
workshop, outdoor pool, caretakers, golf room
and caravan storage
The development is generally consistent with the previous layout (refer below) approved under the
changed approval dated 3 March 2015 (refer to Appendix B). As mentioned in section 4.1, the
intention is to transition and preserve the existing use and development rights established by existing
approval. The individual Material Change of Use components are described as follows:
Approved Site Plan Proposed Site Plan
Planning Report – Palm Lake Resort- Cooroy Page 8 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.