GIA application and Court Judgement Part 1 of 2 132006.268..02

of 26

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 

  
   
  
   
    
   
     
  

O0rH

“5

ROS WOR

  
 

1) Introduction

Cooroy Mountain Springwater Pty Ltd
commissioned Gilbert & Sutherland Pty Ltd
(G&S) to prepare a Conceptual Effluent
Treatment and Disposal Strategy for Lot 2
$P143409, 314 Cooroy Mountain Road,
Cooray Queensland (‘the site’). The site
occupies a total area of 48.17 hectares and
is shown on Orawing HJ0085.1.1.

An Effluent Disposal Report was previously
prepared for the site by Global Testing Pty
Ltd in 2007",

This current assessment constitutes a
revision of the site effluent treatment and

disposal strategy in accordance with AS/NZS

1547:2000 ‘On-site domestic wastewater
management’ and the experts agreement
dated 2 September 2009.

The issues raised in the Report of Experts

Meeting September 2, 2009 relevant to this

conceptual assessment are reproduced
below.

* Anupdated effluent treatment and

disposal strategy (ET&DS) is
required for the project, to
demonstrate that adequate
treatment of wastewater from
plant and wash down, and from
staff and suitable on site disposal,

 

* Pinkney, M.S., 2007, Effluent Disposal Report -

Existing residence & proposed extensions ta existing

factory, 374 Cooray Mountain Road, Cooroy, Global
Testing , Noosaville, Queensland,

 

GILBERT+SUTHERLAND,

taking account of current plant
staffing and waste generation
figures. A conceptual ET&DS
should be completed by G&S to
support the current application, to
outline EP's ta be treated,
treatment process, and disposal
areas and locations. This work

Shouid include suitable sampling

and testing of the current waste
stream discharge, appropriate to
the relevant sources.

A further investigation of actuat
EP's being generated by the
combination of plant, wash down
and staff wastewater is to be
carried out by G&S to support the
current application, and to assess if
additional ERA ficensing is required
for the site.

In performing this assessment site physical
characteristics and soil suitability have been
reviewed.

i-1
Log in to download the original file

GIA application and Court Judgement Part 1 of 2 132006.268..02.pdf · 807 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.