Original source · versioned page text
GIA application and Court Judgement Part 1 of 2 132006.268..02
AMENDMENT 2 The Cooroy Mountain Spring Water facility will operate with a maximum of 10 employees and a maximum of 3 visitors. As such, it is requested that Condition 13, which refers to the required number of carparks, be amended as follows: 13. A minimum number of 28 13 uncovered carpark spaces shall be provided on site, including 1 clearly defined disabled carpark space. AMENDMENT 3 It is requested that a payment plan be implemented for the contributions outlined within Conditions 15 and 16. As such, itis requested that the following notation be included: Payment of the applicable contributions outlined by Conditions 15 and 16 is to be made in accordance with the approved payment plan. AMENDMENT 4 Condition 18A (i) - (vii) refers to Effluent Disposal requirements, which will now be superseded by the Site and Soil Investigation for On-site Wastewater Treatment and Effluent Disposal prepared by Future-plus Environmental (refer to Attachment Ill). This report addresses each provision within Condition 18A and integrates the relevant requirements or changes, where applicable. As such, the following amendments are requested: 18A. The design and construction of the on-site effluent disposal system and disposal area shall be in accordance with the Concepty fluen eatment_and—Disposal_Strategy_prepared_by_Gilben_and prepared by Future-plus Environmental, dated November-2009-November 2013, subject to the following requirements: (i) | Ongoing monitoring of treatment process and disposal areas shall be undertaken to ensure both are functioning effectively over time. They shail be undertaken generally as follows: e Annual monitoring shall be undertaken form the time of commissioning to determine the quality of the wastewater produced from the effluent treatment system; ¢ Monitoring of the soils, vegetation and groundwater in the application area shall be undertaken every three years to establish that such is not percolating into the groundwater; e Sampling and testing shall be in accordance with relevant regulatory requirements and manuals such as those provided by the Environmental Protection Agency, with testing undertaken by an accredited Laboratory; ¢ Continuous monitoring shall be undertaken by the system for any water on the surface of the application area, downslope resurfacing, changing plant growth on or around the application area and any other signs of problems, and addressed through maintenance or servicing.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.