Original source · versioned page text
Meeting papers
Very large file (41.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Note:
- refer to Sheet 3 for three dimensional
views of proposed changes
NSC Approved Site Plan
16/12/2004
BSW BNE
BNW 47° 01' 48" Property Boundary
40535
2"
35° 37' 1
15200
2"
35° 37' 1
Driveway Crossover
15200
Lot 2
eet
Boundary
Duke Str
Boundary
Existing Residence
thw ay
6000
1 2
3
Pa
th
Property
w
Public Pa
Setback
Property
a
y
Lot 1
Proposed
Pool 6000
Proposed
Roof
Extension
Setback
Proposed
Roof
Setback
Setback
2000
1500
BSE 47° 01' 48"
40535 Property Boundary
Proposed Site Plan
2 1 : 200
Proposed Change Lot 2
JMF DESIGN PTY LTD CLIENT: LOCATION: Project number NO: DATE: AMENDMENTS:
Unit 1/60 Gateway Drive
Noosaville Q 4566
Kelsey & Scott Rissman 27 Duke St Site Plans 25/11/2024
23/12/2024
Existing Plans
Proposed Plans
Unit 1, 27 Duke Street, 2024
e: [email protected] 02 17/01/2025 For Approval
Sunshine Beach Qld 18/02/2025 MCU Application
www.jmfdesign.com.au PROJECT: 4567 Date Scale Drawn by JG 27/02/2025 Town Planning
Unit Extension March 2025 28/02/2025 Town Planning
Drafting: Jessica Fleming 1 : 200 Checked by JMF 04/03/2025 Town Planning
QBCC 15200440
Document Set ID: 24101594
23659169
Page 38 of 100
Version: 1, Version Date: 05/09/2025
27/03/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.