PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 9 DECEMBER 2025
frequent discharges or the risk of erosion during less frequent events.
Additional conditions 18 December 2025
Approved Plans
46. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table below.
Plan No. Rev. Plan/Document Name Date
GC 147 MPAC 1 0 Site Now prepared by Flexure Pty Ltd 14/02/2025
GC 147 MPAC 4 0 Infrastructure and demolition prepared by 14/02/2025
Flexure Pty Ltd
GC 147 MPAC 5 0 Site – proposed works prepared by Flexure 14/02/2025
Pty Ltd
GC 147 MPAC 6 0 Site + new weighbridges prepared by 14/02/2025
Flexure Pty Ltd
GC 147 MPAC 7 0 Site – infrastructure prepared by Flexure Pty 14/02/2025
Ltd
GC 147 MPAC 8 0 Plan – Reviva-ground, 1st prepared by 14/02/2025
Flexure Pty Ltd
GC 147 MPAC 9 0 Plan – Reviva-roof prepared by Flexure Pty 14/02/2025
Ltd
GC 147 MPAC 10 0 Plan – structure reviva prepared by Flexure 14/02/2025
Pty Ltd
GC 147 MPAC 11 0 Plan – Transfer – ground prepared by 14/02/2025
Flexure Pty Ltd
GC 147 MPAC 12 0 Plan – Transfer – 1st prepared by Flexure 14/02/2025
Pty Ltd
GC 147 MPAC 13 0 Plan – Transfer – roof prepared by Flexure 14/02/2025
Pty Ltd
GC 147 MPAC 14 0 Plan – structure transfer prepared by 14/02/2025
Flexure Pty Ltd
GC 147 MPAC 15 0 Sections prepared by Flexure Pty Ltd 14/02/2025
GC 147 MPAC 16 0 Elevations Reviva prepared by Flexure Pty 14/02/2025
Ltd
GC 147 MPAC 17 0 Elevations Transfer prepared by Flexure 14/02/2025
Pty Ltd
GC 147 MPAC 18 0 Reviva Entry View prepared by Flexure Pty 14/02/2025
Ltd
Page 58 of 100
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.