Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

TIA - Application decision - s62A (PA) - Approval_1

Attached to the e-mail SARA Referral agency response – with conditions - MCU19/0114 & RAL19/0027.

of 13

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Please refer to Attachment A for the findings on material questions of fact and the evidence or
other material on which those findings were based.

Information about the Decision required to be given under section 67(2) of TIA
1. There is no guarantee of the continuation of road access arrangements, as this depends on
    future traffic safety and efficiency circumstances.

2. In accordance with section 70 of the TIA, the applicant for the planning application is bound by
   this decision. A copy of section 70 is attached as Attachment B, as required, for information.

Further information about the decision
1. In accordance with section 67(7) of TIA, this decision notice:
       a) starts to have effect when the development approval has effect; and
       b) stops having effect if the development approval lapses or is cancelled; and
       c) replaces any earlier decision made under section 62(1) in relation to the land.

2. In accordance with section 485 of the TIA and section 31 of the Transport Planning and
   Coordination Act 1994 (TPCA), a person whose interests are affected by this decision may apply
   for a review of this decision only within 28 days after notice of the decision was given under the
   TIA. A copy of the review provisions under TIA and TPCA are attached in Attachment C for
   information.

3. In accordance with section 485B of the TIA and section 35 of TPCA a person may appeal
   against a reviewed decision. The person must have applied to have the decision reviewed
   before an appeal about the decision can be lodged in the Planning and Environment Court. A
   copy of the Appeal Provisions under TIA and TPCA is attached in Attachment C for information.

Further approvals
The Department of Transport and Main Roads also provides the following information in relation to
this approval:

1. RoadAc   c essWor ksAppr  ov alRequi r
                                        ed–Wr   i
                                                ttenappr ov alisr equi
                                                                     redf r
                                                                          om t hedepar  tmentt  o
   carry out road works that are road access works (including driveways) on a state-controlled road
   in accordance with section 33 of the TIA. This approval must be obtained prior to commencing
   any works on the state-controlled road. The approval process may require the approval of
   engineering designs of the proposed works, certified by a Registered Professional Engineer of
   Queensland (RPEQ). Please contact the department to make an application.



2. General advice:
      a) The intersection works including, but not limited to, any new or required adjustments
         and/or relocations to existing services, cycle facilities, bus stops, accesses, drainage,
         lighting, line marking, street furniture verge and footpath treatments, and so on within the
         state- controlled road must be provided by the applicant at no cost to the Department of
         Transport and Main Roads.




                                                                                            Page 3 of 11
Log in to download the original file

TIA - Application decision - s62A (PA) - Approval_1.pdf · 1.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.