Original source · versioned page text
P-EA-100527093 - EA Permit - Noosa Shire Council - 20231108 (3)
Attached to the e-mail MCU23/0039 & OPW23/0052 - SARA concurrence agency response.
Permit
Environmental authority P-EA-100527093
d) the date and amount of material removed in tonnage and volume (m3); and
e) the methodology used to calculate tonnage and volume of material removed; and
f) the date, tonnage and volume of material placed at the placement site; and
g) a survey, prepared by an appropriately qualified person, of the placement site and
the surrounding adjacent area likely to be affected by the placement.
LAND
Treatment and management of acid sulfate soils must comply with the latest edition of the
L1 Queensland acid sulfate soil technical manual (available on the Queensland government
website).
Placement of dredged material must occur in a way that creates a safe, stable, non-
L2
polluting landform.
Beach Nourishment
L3.0 Placement of dredged material for beach nourishment must occur in a way that creates a
safe landform that is uniform with the surrounding environment.
Earthworks associated with beach nourishment must avoid underlying bedrock, coffee
L3.1
rock, and other cemented sediment material or consolidated mud/organic material layers.
Dredged material placed under condition G1 of this environmental authority must not cover
L4
any dune vegetation.
WATER
This authority permits the release of bed sediments necessarily disturbed as a result of
WT1 dredging provided that the release of those bed sediments is within the approved location(s)
specified in condition G1.
A sediment plume monitoring program must:
a) be developed and implemented by an appropriately qualified person; and
WT2
b) include trigger levels and management actions to ensure the requirements of
condition WT5.
Dredging must cease while the sediment plume extends to within 10m of a sensitive receptor
WT3
that is not within the approved location(s) specified in condition G1.
This environmental authority permits the release of sediments naturally distributed following
WT4
the completion of beach nourishment activities.
Page 10 of 18 • ESR/2016/3415 • Version 3.00 • Last reviewed: 29 MAR 2023 Department of Environment and Science
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.