                                                                                                                  Permit
                                                               Environmental authority P-EA-100527093

                    The dredging activity must be undertaken in accordance with the Dredge Management
      G12.4
                    Plan required in condition G12.0.
                    Sediment Sampling
                    Prior to commencing a dredge operation, a Sampling Program must be designed and
                    signed off by an appropriately qualified person, which meets the following minimum
                    requirements in the latest edition of the National assessment guidelines for dredging:
      G13.0
                         a) testing for parameters listed in Table 1: Practical quantitation limits for typical
                            sediment contaminants, and other analytical parameters; and
                         b) number of sampling locations listed in Table 6: Minimum number of sampling
                            locations.
                    Prior to commencing a dredge operation, sediments from the dredge footprint must be
      G13.1
                    sampled in accordance with the Sampling Program.
                    A written statement of compliance must be submitted4 to the administering authority at least
                    20 business days prior to the commencing a dredge operation that:
                    a) is prepared by an appropriately qualified person; and
                    b) states whether the sampling was undertaken in accordance with the Sampling Program;
                       and
                    c) states whether the sediments sampled exceed the Practical Quantitation Limits for the
                       parameters in Table1: Practical quantitation limits for typical sediment contaminants, and
      G13.2
                       other analytical parameters of the National assessment guidelines for dredging; and
                    d) contains any supporting information relied upon in making the statement.
                    4 Submission can be via email to [email protected] or mailed to:

                              Department of Environment and Science
                              Permit and Licence Management
                              Implementation and Support Unit
                              GPO Box 2454
                              Brisbane QLD 4001
                    A Dredge Operation Completion Report must be prepared by an appropriately qualified
                    person and submitted5 to the administering authority within 3 months of the completion of
                    a dredge operation.
                    5 Submission can be via email to [email protected] or mailed to:
      G14.0
                              Department of Environment and Science
                              Permit and Licence Management
                              Implementation and Support Unit
                              GPO Box 2454
                              Brisbane QLD 4001
                    The Dredge Operation Completion Report required by condition G14.0 must include:
                         a) the results, including all raw data, from any monitoring conducted during the carrying
                            out of the dredge operation;
                         b) a description of actions taken to minimise any environmental risk identified during
      G14.1                 the dredge operation, including but not limited to actions taken as a result of risks
                            identified from monitoring and environmental complaints; and
                         c) a hydrographic survey prepared by an appropriately qualified person of the
                            dredge footprint and the surrounding adjacent area likely to have been affected by
                            the dredging during the relevant dredge operation; and




Page 9 of 18 • ESR/2016/3415 • Version 3.00 • Last reviewed: 29 MAR 2023           Department of Environment and Science
Log in to download the original file

P-EA-100527093 - EA Permit - Noosa Shire Council - 20231108 (3).pdf · 6.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.