Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

SUPERSEDEDApproved Plan OPW22-0123

of 78

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 24, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
4.          CRITICAL HOLD POINTS
The Contractor must request the Landscape Architect to attend inspections or provide approval at the
required critical hold points noted in this document. It is the Contractor’s responsibility to adequately notify
the Landscape Architect.

Sufficient allowance of timing needs to be provided for to allow for rejection of works and re-work or re-
ordering of materials, to then not affect the overall project delivery timeframes.

Lead times for ordering of all components in addition to and allowing for hold point inspections or shop
drawing reviews must be organised by the Contractor.

Any failure to co-ordinate these points resulting in delays, or demolition and re-construction of works,
extension of maintenance periods or ability for handover certification to be undertaken, are the responsibility
of the Contractor.




4.1.        HOLD POINT SCHEDULE
          HOLD POINTS

     1    Council / Authority approvals conditions have been supplied to Contractor / Head Contractor, and
          incorporated into the Construction Documentation set

     2    Tree, palm and plant species stock ordering, upon award of construction contract. Early approval is
          critical to avoid construction delays

     3    Advanced tree and palm nursery stock approval obtained from the Landscape Architect either through
          photos supplied or via nursery visit.




URBIS
URB -P0003847-001-SP                                                                                         PAGE   9
Log in to download the original file

SUPERSEDEDApproved Plan OPW22-0123.pdf · 10.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.