Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

SUPERSEDEDApproved Plan OPW22-0123

of 78

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 40, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
End of Establishment Maintenance Inspection
Four months prior to the agreed end of establishment period the Contractor, the Landscape Architect and the
Superintendent shall carry out a joint Inspection to ensure all landscape works are maintained as agreed.

Items identified requiring attention, during the inspection are to be addressed immediately or as agreed.

Quality Control Inspection
Two weeks prior to the agreed end of establishment period the Contractor and the Landscape Architect shall
carry out an Inspection to ensure all landscape works are ready for the hand-over.

Items identified requiring attention, during the inspection are to be addressed immediately.

Handover
At the end of establishment period the Contractor, the Landscape Architect and the Superintendent shall
carry out a joint Inspection to ensure all landscape works are maintained and cleaned to the client’s
expectation.

Prior to the Handover the Contractor must provide the certificates below to the Superintendent:

•    Arborist certification that all trees and palms in public land have been inspected and rectification works
     for public safety and longevity of the tree/s have been completed.
•    Prove of completion of all maintenance works which were required within the 52 weeks period by the
     manufacturers recommendation.




URBIS
URB -P0003847-001-SP                                                                                      PAGE   25
Log in to download the original file

SUPERSEDEDApproved Plan OPW22-0123.pdf · 10.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.