SUPERSEDEDApproved Plan OPW22-0123

of 78

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 41, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
10.1.       INSPECTION SCHEDULE

(REFER TO URBIS FEE PROPOSAL TO CONFIRM THE NUMBER OF SITE INSPECTIONS ALLOWED
FOR. SPECIFY BELOW)

          Inspections

1        Prestart Meeting (1x inspection)

2        Hold point inspections as per Hold point schedule (Xx inspections)

3       Construction period inspections (Xx inspections)

4        Practical Completion Inspection (1x inspection)

5        Defects Completion Inspection (1x inspection)

6        Council On-Maintenance Inspection (1x inspection)

7        End of Establishment Maintenance Inspection (1x inspection)

8        Client / Council Off Maintenance Handover Inspection (1x inspection)



No sub-staging, separable portions or trade packages have been allowed for during documentation or
construction. It is assumed that the landscape set is suitable for trade packages purposes.
No allowance has been made for changes to the plant schedules or drawings, nor for updated client / approval
authority approvals or contractor liaison arising from lack of early plant procurement by the contractor, leading
to unavailability of specified trees or plants. This work will be done on hourly rate basis, payable by the Head
Contractor.
No allowance has been made for us to make modifications to our CAD (2D) or Revit (3D) documentation during
construction based on site changes, or updates from other consultants for example. It is assumed that any
changes will be captured as part of the “As-constructed” scope.
No allowance has been made to attend regular site co-ordination meetings. If these meetings align with the
above listed site inspections, the Landscape Architect will assess if attendance is required.
If additional inspections to those listed above are required due to incorrectly installed works, or failure
to order materials and plant stock, or to maintain the completed works sufficiently to achieve
handover, the costs for additional Landscape Architects inspections are to the responsibility of the
Contractor / Head Contractor.




URBIS
URB -P0003847-001-SP                                                                                     PAGE   26
Log in to download the original file

SUPERSEDEDApproved Plan OPW22-0123.pdf · 10.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗