Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Attachment 8- Amended Engineering Report MCU12/0208

of 109

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (61.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 105, section 1. The text section number identifies this passage in the reader.

                                                                                                                              Engineering Report
                                                                                                                                Noosa on Weyba



22 Demonstrate how the significant stands of Old Growth Trees               Refer section 3.1 and 3.3
located along the Hollett and Tidswell Road verges are to be
protected from the proposed road widening/upgrading works and
the provision of services e.g. water and sewerage, power and
telecommunications and bikeways/pedestrian pathways.

55 Demonstrate that the proposed improvements to the external road          Sketch SK102 locates the roundabout with reference to the existing road
network (Walter Hay Drive) are achievable due to the existing               reserves and property boundaries. Refer to section 3.1.1
property boundaries, other existing infrastructure and the existing
topography.

58 Provide additional detail on the proposed flood free                     This connection is not required for this development, , rather the flood free
connection to Lake Entrance Boulevard. The detail must include:             access is a proposed added benefit to the existing neighbouring
(a) The intent of link (does it provide for vehicles as well as             community. Refer to section 4.2
pedestrians)
(b) The proposed alignment
(c) The design of the formation
(d) The full extent of works (drainage, banks, batters etc)
(e) The consent of land owners that are affected by the works

59 Provide further detail in respect of land tenure and alignment           Refer to section 1.1 and the town planner’s response
for the proposed Hollett Road emergency access route.

62 Provide additional detail on the alignment of the proposed water               a)   Refer to section 5.1 & 6.1, the development can be completed
mains and sewer rising mains. The detail must demonstrate that                         without any landowners consent if required.
the works are achievable and include:                                             b)   Refer to section 5.3 & 6.2 & sketch SK702 – following
(a) The consent of land owners that are affected by the works                          discussions with Unitywater and our experience on multiple
(b) The delineation between private and public infrastructure                          developments of a similar nature. All water & sewer is highly
                                                                                       likely to be the asset of Unitywater.
70 Further information is required to explain how this could function,      Refer to item 58 & 59
taking account of both land tenure considerations and physical
design considerations. It is noted that there is inconsistency in the
location of this emergency access route in some of the supporting
reports. Similarly, more details are necessary in respect of land
tenure and alignment in respect of the proposed Hollett Road
emergency access route.

85 Walter Hay Drive has been considered for future duplication,             Refer to section 3.1
demonstrate how the development will take this into consideration.
Allowance must be made for road
reserve dedications and separation of the proposed residential
development from the road corridor.

91 A full ASS assessment needs to be provided prior to any approval         Following discussions with Council, it was agreed to provide a preliminary
demonstrating that there will not be any impacts to any nearby              ASS assessment to ensure the strategy for dealing with the ASS with
sensitive ecosystems. The assessment needs to be carried out in             consideration to groundwater on the site. Refer to section 2.6 and
accordance with the following guidelines:                                   preliminary ASSMP in Appendix F.
 (i) The State Planning Policy Guideline 2/02: Planning and
Managing Development involving Acid Sulphate Soils published by
the Qld Department of Natural Resources and Water;                          A final ASSMP can only be completed upon knowing the lot layout and
 (ii) QASSIT: Guidelines for Sampling & Analysis of Lowland Acid            hence earthworks which can only be completed in future applications
Sulphate Soils (ASS) in Queensland 1998, published by the
Department of Natural Resources and Water; and (iii) The
Queensland Acid Sulphate Soil Technical Manual: Soil
Management Guidelines Version 3.8, published by the Department of
Natural Resources and Water.

The ASS assessment as a minimum needs to include a plan
showing location of boreholes, works details (eg depths of
excavation and quantities of fill), bore logs, sampling regime/results
of testing for the presence or absence of ASS including
justification for any reduced sampling regime, a groundwater analysis
and detailed interpretation if necessary. It needs to also include
the necessary measures for managing ASS (if found) and
groundwater on site. If excavated material requires treatment, full
details of where it is to be treated is required as well as
proposed haulage routes.




         October 2013                                                    Cardno                                                                 30

Used in these records

About this file

File size
61.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8- Amended Engineering Report MCU12_0208.pdf · 61.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.