Council archive · source document
Attachment 8- Amended Engineering Report MCU12/0208
Very large file (61.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 106, section 1. The text section number identifies this passage in the reader.
Engineering Report
Noosa on Weyba
92 A conceptual ESC Plan needs to be submitted prior to any Refer to section 2.5 and preliminary ESCP in Appendix E.
approval and needs to address the following:
a) demonstrate that the design, intensity, configuration and A final ESCP can only be completed upon knowing the lot layout and hence
establishment of development, is compatible with the physical earthworks which can only be completed in future applications
constraints of the site and receiving environment
b) includes a contoured site plan showing natural features and
location of the proposed control structures, including sediment
basins, ESC treatment train and an overview strategy for the site
outlining the sequence of development, and
temporary and permanent management mechanisms with an
emphasis on site stabilisation to prevent erosion in the first
instance, until commissioning of permanent water sensitive urban
design features and addresses the following:
I. Sediment basins:
are nominated for treatment of stormwater runoff from all
areas which are proposed for clearing, earthworks,
stockpiling or otherwise exposed soils.
are appropriately sized based on a Type D basin
(preliminary
calculations are provided and based on SCRC Manual or
IECA)
are located:
o outside of waterways and flood prone areas (at least the
1 in 2
o year ARI level)
o where the basin will not be inundated by groundwater
o other than in areas of retained vegetation
o on topography where they are capable of being
constructed (eg not on steep slopes)
II. In areas of the site where a sediment basin is not feasible,
compensatory erosion and sediment controls, which are capable
of achieving the stormwater release limit, are nominated.
III. The proposed extent of vegetation clearing is limited to that
necessary to undertake the works.
IV. Clearly identifies the proposed extent of soil disturbance and
provides indicative staging of the proposed construction activities
such that the area of soil exposed at any one time will be minimised.
V. Proposed clean upslope stormwater diversions around or through
the site are indicated. Alternatively, if it is not feasible to divert clean
water around or through the site, the Plan indicates how the additional
volume of stormwater runoff will be managed.
VI. Proposed concentrated flow paths for conveying contaminated
stormwater are indicated
October 2013 Cardno 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8- Amended Engineering Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 61.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.