Council archive · source document
Attachment 8- Amended Engineering Report MCU12/0208
Very large file (61.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 18, section 1. The text section number identifies this passage in the reader.
Engineering Report
Noosa on Weyba
6 Water Reticulation
A water network analysis has been undertaken in consultation with Unitywater to determine the impact of the
development on the existing water network and develop a servicing strategy for the site.
The proposed development would connect to the existing network within the Noosa Industrial District Meter
Area (NIDMA) and serviced via the Tewantin Reservoirs.
In preparing the water supply servicing strategy a performance assessment of the development was also
undertaken by MWH for Unitywater.
The conclusions of the MWH report were:
> Under maximum hour demand conditions, Unitywater Desired Standard of Service (DSS) were met at the
proposed development site and within Noosa Industrial DMA during the 2038 planning horizon;
> Under fire flow demand conditions, Unitywater DSS were met at the proposed development site and
within Noosa Industrial DMA during the 2038 planning horizon;
> The storage assessment identified that the inclusion of the Noosa on Weyba development brings forward
storage deficiency of the Tewantin Reservoir to 2016 when assessed against the DSS. A total storage
deficiency of the Tewantin Reservoir of 1.64 ML was identified at the 2031 planning horizon; and
> No augmentation of the existing network is required.
For further details refer to the Water Supply and Sewerage Analysis prepared by Cardno.
6.1 External Connections
The existing Noosa water supply network was assessed and suitable connections to the development
identified. An existing 600 mm diameter trunk main along Eenie Creek Road is the primary service main for
Noosa and is in close proximity to the development. In addition, an existing residential development located
immediately north of the proposed development is serviced via a 150 mm diameter main. It is proposed to
utilise both the 600 mm trunk and the smaller 150 mm diameter mains to service the development.
A primary 250mm diameter connection is proposed to the 600 mm diameter trunk main at the intersection of
Eenie Creek Road and Walter Hay Drive. A secondary 200 mm diameter connection is proposed to connect
to the 150 mm diameter main along Lake Entrance Boulevard. Cardno Sketch SK600 indicates the
proposed connection points to the existing network.
6.2 Internal Network
A network of trunk mains and smaller reticulations mains is required to maintain Unitywater’s DSS within the
development.
A 250 mm diameter main along Walter Hay Drive is proposed between the connection at the 600mm
diameter trunk main along Eenie Creek Road and the development. This main will provide the bulk of flow to
the development and is required to maintain non-residential fire flows (30l/s) to the development. A second
200 mm diameter connection to the existing mains at Lake Entrance Boulevard should be considered. An
internal 200 mm diameter distribution main is proposed to convey flow to each precinct within the
development. 150 mm diameter mains will be required to maintain the fire flow DSS. The rest of the
network would comprise of 100mm diameter mains to service properties. Cardno Sketch SK600 indicates
proposed internal trunk water network.
Whether the development is a body corporate scheme or a council asset, the probable outcome for the
ownership of the water asset will be Unitywater taking ownership of the entire system. This scenario has
been the case for multiple developments Cardno have been involved with and there is no obstacle for this
scenario to happen on this development. Ownership will be determined by the Infrastructure Agreement
which we have been in discussion with Unitywater to complete.
October 2013 Cardno 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8- Amended Engineering Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 61.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.