Engineering Report
Noosa on Weyba
7 Integrated Water Cycle Management Plan
An Integrated Water Cycle Management Plan (IWCMP) has been prepared by Gilbert and Sutherland. The
ICWMP considered several servicing options for the development and recommends Option 4 as the
preferred servicing strategy. Option 4 assumes sewage is treated off-site at the Noosaville STP and
maximises rainwater harvesting at each residence.
The recommendations of the IWCMP will be adopted as part of the WSUD strategy for the site. Rainwater
harvesting will be maximised through the connection of all available roof area to the tank and the utilisation
of rainwater tank sizes around twice the size prescribed by the Queensland Development Code. Collected
rainwater will be used for irrigation, toilet flushing and laundry purposes. This will significantly reduce the
potable water demand of the site.
For further details refer to the IWCMP prepared by Gilbert and Sutherland.
October 2013 Cardno 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8- Amended Engineering Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 61.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.