Attachment 8- Amended Engineering Report MCU12/0208

of 109

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (61.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 68, section 1. The text section number identifies this passage in the reader.

                                                                       Preliminary Erosion & Sediment Control Strategy
                                                                                                    Noosa on Weyba



6.7          Correction Action
Non-compliance with the water quality ‘Discharge Performance Criteria’, the strategies outlined in the ESCP
and / or conditions of approval must be dealt with immediately. If there is a breach or infringement of
conditions, action will be taken consistent with the nature and seriousness of the breach or infringement.
Action may include the following:
   Re-establish erosion control structures if they have failed.
   More intensive implementation of the erosion control measures in accordance with the IECA ‘Best
   Practice Erosion and Sediment Control (2008)’ guidelines, and on advice from a suitably qualified
   consultant if necessary.
   Issuing of a “stop work notice”.
   A notice to comply pending re-inspection of the site.
If the nominated water quality objectives are not met, Cardno or another suitably qualified consultant is to be
notified and an investigation into the cause and source of the pollutants is to be conducted. The appropriate
remedial action should then be taken based on the outcomes of the investigation.




27 September 2013                                    Cardno                                                        11

Used in these records

About this file

File size
61.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8- Amended Engineering Report MCU12_0208.pdf · 61.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.